The NP-hard problem of task scheduling with communication delays (P|prec,c_{ij}|C_{\mathrm{max}}) is often tackled using approximate methods, but guarantees on the quality of these heuristic solutions are hard to come by. Optimal schedules…
We consider the single machine scheduling problem with job-dependent machine deterioration. In the problem, we are given a single machine with an initial non-negative maintenance level, and a set of jobs each with a non-preemptive…
We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal…
We consider the problem of scheduling jobs with equal lengths on uniform parallel batch machines with non-identical capacities where each job can only be processed on a specified subset of machines called its processing set. For the case of…
Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is mandatory in many…
Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are…
This study is concerned with the determination of optimal appointment times for a sequence of jobs with uncertain duration. We investigate the data-driven Appointment Scheduling Problem (ASP) when one has $n$ observations of $p$ features…
In this paper we look at the problem of scheduling tasks on a single-processor system, where each task requires unit time and must be scheduled within a certain time window, and each task can be added to or removed from the system at any…
We consider a parallel system of $m$ identical machines prone to unpredictable crashes and restarts, trying to cope with the continuous arrival of tasks to be executed. Tasks have different computational requirements (i.e., processing time…
In this paper we consider single machine scheduling problems with additional non-renewable resource constraints. Examples for non-renewable resources include raw materials, energy, or money. Usually they have an initial stock and…
We consider the problem of scheduling on a single processor a given set of n jobs. Each job j has a workload w_j and a release time r_j. The processor can vary its speed and hibernate to reduce energy consumption. In a schedule minimizing…
In this paper, we consider the problem of choosing a minimum cost set of resources for executing a specified set of jobs. Each input job is an interval, determined by its start-time and end-time. Each resource is also an interval determined…
This paper explores general multi-robot task and motion planning, where multiple robots in close proximity manipulate objects while satisfying constraints and a given goal. In particular, we formulate the plan refinement problem--which,…
We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related…
We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation…
For scheduling in flexible manufacturing system (FMS), many factors should be considered, it is difficult to solve the scheduling problem by satisfying different criteria (production cost, utilization of system, number of movements of part,…
The combined increase of energy demand and environmental pollution at a global scale is entailing a rethinking of the production models in sustainable terms. As a consequence, energy suppliers are starting to adopt strategies that flatten…
Modern data centers face new scheduling challenges in optimizing job-level performance objectives, where a significant challenge is the scheduling of highly parallel data flows with a common performance goal (e.g., the shuffle operations in…
We consider the problem of scheduling $n$ jobs on $m$ uniform machines while minimizing the makespan ($Q||C_{\max}$) and maximizing the minimum completion time ($Q||C_{\min}$) in an online setting with migration of jobs. In this online…
In this paper we consider the scheduling problem of hard real-time systems composed of periodic constrained-deadline tasks upon identical multiprocessor platforms. We assume that tasks are scheduled by using the global-EDF scheduler. We…