Related papers: EPTAS for parallel identical machine scheduling wi…
Motivated by issues of saving energy in data centers we define a collection of new problems referred to as "machine activation" problems. The central framework we introduce considers a collection of $m$ machines (unrelated or related) with…
This paper studies a scheduling problem in a parallel machine setting, where each machine must adhere to a predetermined fixed order for processing the jobs. Given $n$ jobs, each with processing times and deadlines, we aim to minimize the…
An optimal solution to the problem of scheduling real-time tasks on a set of identical processors is derived. The described approach is based on solving an equivalent uniprocessor real-time scheduling problem. Although there are other…
This paper studies the application of the simulated annealing metaheuristic on the identical parallel machine scheduling problem, a variant of the broader optimal job scheduling problem. In the identical parallel machine scheduling problem,…
Real-life parallel machine scheduling problems can be characterized by: (i) limited information about the exact task duration at scheduling time, and (ii) an opportunity to reschedule the remaining tasks each time a task processing is…
This paper studies the bicriteria problem of scheduling $n$ jobs on a serial-batch machine to minimize makespan and maximum cost simultaneously. A serial-batch machine can process up to $b$ jobs as a batch, where $b$ is known as the batch…
This paper addresses a production scheduling problem derived from an industrial use case, focusing on unrelated parallel machine scheduling with the personnel availability constraint. The proposed model optimizes the production plan over a…
Parametric timed automata (PTA) extend timed automata by allowing parameters in clock constraints. Such a formalism is for instance useful when reasoning about unknown delays in a timed system. Using existing techniques, a user can…
In this paper, we propose a general framework to design {efficient} polynomial time approximation schemes (EPTAS) for fundamental stochastic combinatorial optimization problems. Given an error parameter $\epsilon>0$, such algorithmic…
The active-time scheduling problem considers the problem of scheduling preemptible jobs with windows (release times and deadlines) on a parallel machine that can schedule up to $g$ jobs during each timestep. The goal in the active-time…
We consider a 1-machine scheduling problem where the temperature of a job rises during processing, and cools down when not being processed according to given linear heating and cooling rates. No job's temperature is allowed to rise above a…
We consider the problem of scheduling multiprocessor jobs to minimize the total completion time under the given energy budget. Each multiprocessor job requires more than one processor at the same moment of time. Processors may operate at…
Scheduling jobs with given processing times on identical parallel machines so as to minimize their total completion time is one of the most basic scheduling problems. We study interesting generalizations of this classical problem involving…
We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. This problem is…
We consider the machine covering problem for selfish related machines. For a constant number of machines, m, we show a monotone polynomial time approximation scheme (PTAS) with running time that is linear in the number of jobs. It uses a…
We consider the uniform parallel machines scheduling problem in the context of optimistic bilevel optimization, where two speed options are considered. In this scenario, the leader aims to minimize the weighted number of tardy jobs, while…
The problem of scheduling with testing in the framework of explorable uncertainty models environments where some preliminary action can influence the duration of a task. In the model, each job has an unknown processing time that can be…
We consider the problem of scheduling non preemptively a set of jobs on parallel identical machines with prior setup operations on a single shared server, where the objective is to minimise the makespan. We develop an arc-flow formulation…