We study the general scheduling problem (GSP) which generalizes and unifies several well-studied preemptive single-machine scheduling problems, such as weighted flow time, weighted sum of completion time, and minimizing the total weight of…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
We develop a new numerical method for approximating the infinite time reachable set of strictly stable linear control systems. By solving a linear program with a constraint that incorporates the system dynamics, we compute a polytope with…
We consider the problem of efficiently scheduling jobs with precedence constraints on a set of identical machines in the presence of a uniform communication delay. Such precedence-constrained jobs can be modeled as a directed acyclic graph,…
In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence…
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing…
We study the classic problem of scheduling $n$ precedence constrained unit-size jobs on $m = O(1)$ machines so as to minimize the makespan. In a recent breakthrough, Levey and Rothvoss \cite{LR16} developed a $(1+\epsilon)$-approximation…
Given a finite metric space $(X\cup Y, \mathbf{d})$ the $k$-median problem is to find a set of $k$ centers $C\subseteq Y$ that minimizes $\sum_{p\in X} \min_{c\in C} \mathbf{d}(p,c)$. In general metrics, the best polynomial time algorithm…
This paper addresses the challenging scheduling problem of coflows with release times, with the objective of minimizing the total weighted completion time. Previous literature has predominantly concentrated on establishing the scheduling…
We give sublinear-time approximation algorithms for some optimization problems arising in machine learning, such as training linear classifiers and finding minimum enclosing balls. Our algorithms can be extended to some kernelized versions…
An important goal in algorithm design is determining the best running time for solving a problem (approximately). For some problems, we know the optimal running time, assuming certain conditional lower bounds. In this work, we study the…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
There is a long history of approximation schemes for the problem of scheduling jobs on identical machines to minimize the makespan. Such a scheme grants a $(1+\epsilon)$-approximation solution for every $\epsilon > 0$, but the running time…
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…
We show that under mild assumptions for a problem whose solutions admit a dynamic programming-like recurrence relation, we can still find a solution under additional packing constraints, which need to be satisfied approximately. The number…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
We present a $\sqrt{e}/(\sqrt{e}-1)$-approximation algorithm for the nonpreemptive scheduling problem to minimize the total weighted completion time of jobs on a single machine subject to release dates and precedence constraints. The…