Related papers: An Upgrade Path for the Fermilab Accelerator Compl…
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT…
The next generation of accelerators for Megawatt proton and heavy-ion beams moves us into a completely new domain of extreme specific energies of up to 0.1 MJ/g (Megajoule/gram) and specific power up to 1 TW/g (Terawatt/gram) in beam…
The Neutrinos at the Main Injector (NuMI) facility at Fermilab is under construction and due to begin operations in late 2004. NuMI will deliver an intense $\nu_{\mu}$ beam of variable energy 2-20 GeV directed into the Earth at 58 mrad.…
Test beam and irradiation facilities are the key enabling infrastructures for research in high energy physics (HEP) and astro-particles. In the last 11 years the Beam-Test Facility (BTF) of the DA{\Phi}NE accelerator complex in the Frascati…
The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first…
The Fermilab Proton Source machines, constituted by Pre-Injector, conventional Linac and Booster synchrotron, at Fermi National Accelerator Laboratory (Fermilab) had have a long history of successful beam operations. Built in late '60s, the…
The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five…
High luminosity in DAFNE needs very high electron and positron currents stored. A full energy (510 MeV) injection system composed by a full energy electron and positron linac and an accumulator-damping ring is presently used. The electron…
The PIP-II project is a program to upgrade the Fermilab accelerator complex. The PIP-II linac includes a 2.1 MeV Medium Energy Beam Transport (MEBT) section that incorporates a unique chopping system to perform arbitrary, bunch-by-bunch…
The creation of intense radioactive beams requires intense and energetic primary beams. A task force analysis of this subject recommended an acceleration system capable of 400 MeV/u uranium at 1 particle uA as an appropriate driver for such…
In view of a possible evolution of the CERN accelerator complex towards higher proton intensities, a 2.2 GeV H- linac with 4 MW beam power has been designed, for use in connection with an accumulator and compressor ring as proton driver of…
The Proton Improvement Plan II (PIPII) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beams for neutrino production. The Linac requires cooling at 80 K, 5 K, and 2 K temperatures, which will…
The Fermilab Tevatron will be the world's highest energy hadron collider until the LHC is commissioned, it has the world's highest energy fixed target beams, and Fermilab will be the leading high energy physics laboratory in the US for the…
The Fermilab Linac is a roughly 145 meter linear accelerator that accelerates H- beam from 750 keV to 400 MeV and provides beam for the Booster and the rest of the accelerator chain. The first section of the Linac is a Drift-Tube Linac…
A new Higher Order Mode (HOM) damper was designed and tested for the Booster accelerator cavity at Fermilab. In anticipation of the PIP-II upgrade, it was discovered that the higher beam intensity of PIP-II may cause beam instability due to…
The High Intensity Proton Accelerator (HIPA) cyclotron at the Paul Scherrer Institut (PSI) delivers 590 MeV CW proton beam with a maximum power of 1.42 MW. After extraction, the beam is transferred in a 120 m long channel towards two target…
The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy for the implementation of this leading-edge,…
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam…
We study the capabilities of the short baseline neutrino program at Fermilab to probe the unitarity of the lepton mixing matrix. We find the sensitivity to be slightly better than the current one. Motivated by the future DUNE experiment, we…
LINAC 4 is a normal conducting H- structure proposed to intensify the proton flux currently available for the CERN accelerator chain. This linac is designed to accelerate a 65 mA beam up to 160 MeV to be injected into the CERN Proton…