Related papers: Joint replenishment meets scheduling
We study ordinal makespan scheduling on small numbers of identical machines, with respect to two parallel solutions. In ordinal scheduling, it is known that jobs are sorted by non-increasing sizes, but the specific sizes are not known in…
Modern computing workloads are often composed of parallelizable jobs. A parallelizable job can be completed more quickly when run on additional servers. However, each job can only use a limited number of servers, known as its…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…
In this paper we consider the problem of scheduling on parallel machines with a presence of incompatibilities between jobs. The incompatibility relation can be modeled as a complete multipartite graph in which each edge denotes a pair of…
We consider the problem of scheduling on a single processor a given set of n jobs. Each job j has a workload w_j and a release time r_j. The processor can vary its speed and hibernate to reduce energy consumption. In a schedule minimizing…
The Job Shop Scheduling Problem (JSP) is a pivotal challenge in operations research and is essential for evaluating the effectiveness and performance of scheduling algorithms. Scheduling problems are a crucial domain in combinatorial…
We propose ScheduleNet, a RL-based real-time scheduler, that can solve various types of multi-agent scheduling problems. We formulate these problems as a semi-MDP with episodic reward (makespan) and learn ScheduleNet, a decentralized…
We consider the Continuous Energy-Constrained Scheduling Problem (CECSP). A set of jobs has to be processed on a continuous, shared resource. A schedule for a job consists of a start time, completion time, and a resource consumption…
This paper considers heuristics for well known resource-constrained project scheduling problem (RCPSP). First a feasible schedule is constructed using randomized best insertion algorithm. The construction is followed by a local search where…
This work studies fixed priority (FP) scheduling of real-time jobs with end-to-end deadlines in a distributed system. Specifically, given a multi-stage pipeline with multiple heterogeneous resources of the same type at each stage, the…
The active-time scheduling problem considers the problem of scheduling preemptible jobs with windows (release times and deadlines) on a parallel machine that can schedule up to $g$ jobs during each timestep. The goal in the active-time…
Ensuring timing guarantees for every individual tasks is critical in real-time systems. Even for periodic tasks, providing timing guarantees for tasks with segmented self-suspending behavior is challenging due to timing anomalies, i.e., the…
We consider the classical problem of scheduling $n$ jobs with release dates on both single and identical parallel machines. We measure the quality of service provided to each job by its stretch, which is defined as the ratio of its response…
In real-time systems, in addition to the functional correctness recurrent tasks must fulfill timing constraints to ensure the correct behavior of the system. Partitioned scheduling is widely used in real-time systems, i.e., the tasks are…
Personnel scheduling problems have received considerable academic attention due to their relevance in various real-world applications. These problems involve preparing feasible schedules for an organization's employees and often account for…
In this paper we study a proportionate flow shop of batching machines with release dates and a fixed number $m \geq 2$ of machines. The scheduling problem has so far barely received any attention in the literature, but recently its…
In online makespan minimization a sequence of jobs $\sigma = J_1,..., J_n$ has to be scheduled on $m$ identical parallel machines so as to minimize the maximum completion time of any job. We investigate the problem with an essentially new…
When parallelizing a set of jobs across many servers, one must balance a trade-off between granting priority to short jobs and maintaining the overall efficiency of the system. When the goal is to minimize the mean flow time of a set of…
This paper considers the problem of scheduling a single batch processing machine such that the total number of tardy jobs is minimized. The machine can simultaneously process several jobs as a batch as long as the machine capacity is not…
In this paper, a method for efficient scheduling to obtain optimum job throughput in a distributed campus grid environment is presented; Traditional job schedulers determine job scheduling using user and job resource attributes. User…