In this paper a class of single machine scheduling problems is considered. It is assumed that job processing times and due dates can be uncertain and they are specified in the form of discrete scenario set. A probability distribution in the…
We consider the problem of scheduling $n$ jobs on $m$ uniform machines while minimizing the makespan ($Q||C_{\max}$) and maximizing the minimum completion time ($Q||C_{\min}$) in an online setting with migration of jobs. In this online…
Scheduling problems in manufacturing, logistics and project management have frequently been modeled using the framework of Resource Constrained Project Scheduling Problems with minimum and maximum time lags (RCPSP/max). Due to the…
In this paper we study a simple extension of the total weighted flowtime minimization problem for single and identical parallel machines. While the standard problem simply defines a set of jobs with their processing times and weights and…
One of the major limitations for the employment of model-based planning and scheduling in practical applications is the need of costly re-planning when an incongruence between the observed reality and the formal model is encountered during…
In many real world scheduling problems, the processing times of tasks are subject to uncertainty. This makes it essential to design schedules that are robust and able to handle potential disruptions. Therefore, we investigate measures that…
We consider the classical makespan minimization scheduling problem where $n$ jobs must be scheduled on $m$ identical machines. Using weighted random sampling, we developed two sublinear time approximation schemes: one for the case where $n$…
We consider the robust permutation flowshop problem under the budgeted uncertainty model, where at most a given number of job processing times may deviate on each machine. We show that solutions for this problem can be determined by solving…
A key property for systems subject to uncertainty in their operating environment is robustness, ensuring that unmodelled, but bounded, disturbances have only a proportionally bounded effect upon the behaviours of the system. Inspired by…
Our goal is to build robust optimization problems for making decisions based on complex data from the past. In robust optimization (RO) generally, the goal is to create a policy for decision-making that is robust to our uncertainty about…
In this paper we study a proportionate flow shop of batching machines with release dates and a fixed number $m \geq 2$ of machines. The scheduling problem has so far barely received any attention in the literature, but recently its…
We study single-stage decision problems in which a subset of items with minimum total cost has to be selected at once from a given set of items, subject to two costs of each item -fixed and uncertain -and cardinality constraints for each…
The NP-hard MATERIAL CONSUMPTION SCHEDULING Problem and closely related problems have been thoroughly studied since the 1980's. Roughly speaking, the problem deals with minimizing the makespan when scheduling jobs that consume non-renewable…
This paper develops a data-driven, constraint-based optimization framework for a complex industrial job shop scheduling problem variant in pharmaceutical manufacturing. The formulation captures fixed routings and designated machines,…
A moldable job is a job that can be executed on an arbitrary number of processors, and whose processing time depends on the number of processors allotted to it. A moldable job is monotone if its work doesn't decrease for an increasing…
Progress in the last decade has brought about significant improvements in the accuracy and speed of SLAM systems, broadening their mapping capabilities. Despite these advancements, long-term operation remains a major challenge, primarily…
Generalizing many well-known and natural scheduling problems, scheduling with job-specific cost functions has gained a lot of attention recently. In this setting, each job incurs a cost depending on its completion time, given by a private…
We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the…
Given a hierarchical plan (or schedule) with uncertain task times, we propose a deterministic polynomial (time and memory) algorithm for estimating the probability that its meets a deadline, or, alternately, that its {\em makespan} is less…
We consider the problem of scheduling $n$ jobs to minimize the makespan on $m$ unrelated machines, where job $j$ requires time $p_{ij}$ if processed on machine $i$. A classic algorithm of Lenstra et al. yields the best known approximation…