Related papers: Scheduling with a processing time oracle
In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence…
We consider the following shared-resource scheduling problem: Given a set of jobs $J$, for each $j\in J$ we must schedule a job-specific processing volume of $v_j>0$. A total resource of $1$ is available at any time. Jobs have a resource…
We consider the online resource minimization problem in which jobs with hard deadlines arrive online over time at their release dates. The task is to determine a feasible schedule on a minimum number of machines. We rigorously study this…
We introduce a natural but seemingly yet unstudied generalization of the problem of scheduling jobs on a single machine so as to minimize the number of tardy jobs. Our generalization lies in simultaneously considering several instances of…
We consider the online busy time scheduling problem motivated by energy and cost minimization in cloud computing systems. The input is a set of jobs $J=\{1,\dots,n\}$ where each job $j\in J$ has a release time $r_j$, deadline $d_j$, and…
The interval scheduling problem is one variant of the scheduling problem. In this paper, we propose a novel variant of the interval scheduling problem, whose definition is as follows: given jobs are specified by their {\em release times},…
We contribute the first randomized algorithm that is an integration of arbitrarily many deterministic algorithms for the fully online multiprocessor scheduling with testing problem. When there are two machines, we show that with two…
We consider the classical online scheduling problem P||C_{max} in which jobs are released over list and provide a nearly optimal online algorithm. More precisely, an online algorithm whose competitive ratio is at most (1+\epsilon) times…
An acceptable response time of a server is an important aspect in many client-server applications; this is evident in situations in which the server is overloaded by many computationally intensive requests. In this work, we consider that…
In moldable job scheduling, we are provided $m$ identical machines and $n$ jobs that can be executed on a variable number of machines. The execution time of each job depends on the number of machines assigned to execute that job. For the…
Consider a system in which tasks of different execution times arrive continuously and have to be executed by a set of processors that are prone to crashes and restarts. In this paper we model and study the impact of parallelism and failures…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
In this paper, the single machine scheduling problem with deteriorating jobs and learning effects are considered, which is shown in the previous research that the SDR method no longer provides an optimal solution for the problem. In order…
We consider non-preemptive scheduling of MapReduce jobs with multiple tasks in the practical scenario where each job requires several map-reduce rounds. We seek to minimize the average weighted completion time and consider scheduling on…
We study a fundamental online scheduling problem where jobs with processing times, weights, and deadlines arrive online over time at their release dates. The task is to preemptively schedule these jobs on a single or multiple (possibly…
We study a new online assignment problem, called the Online Task Assignment with Controllable Processing Time. In a bipartite graph, a set of online vertices (tasks) should be assigned to a set of offline vertices (machines) under the known…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
In parallel machine scheduling, we are given a set of jobs, together with a number of machines and our goal is to decide for each job, when and on which machine(s) it should be scheduled in order to minimize some objective function.…
We consider a 1-machine scheduling problem where the temperature of a job rises during processing, and cools down when not being processed according to given linear heating and cooling rates. No job's temperature is allowed to rise above a…
We investigate multi-organizational scheduling problems, building upon the framework introduced by Pascual et al.[2009]. In this setting, multiple organizations each own a set of identical machines and sequential jobs with distinct…