English
Related papers

Related papers: New complexity and approximability results for min…

200 papers

The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…

Data Structures and Algorithms · Computer Science 2019-11-28 Kristóf Bérczi , Tamás Király , Simon Omlor

This paper studies a single-machine scheduling problem with a non-renewable resource (NR-SSP) and total weighted completion time criterion. The non-renewable resource is consumed when the machine starts processing a job. We consider the…

Data Structures and Algorithms · Computer Science 2021-05-12 Susumu Hashimoto , Shinji Mizuno

Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing…

Data Structures and Algorithms · Computer Science 2019-10-22 Alexander Mäcker , Friedhelm Meyer auf der Heide , Simon Pukrop

In this paper we study the classical scheduling problem of minimizing the total weighted completion time on a single machine with the constraint that one specific job must be scheduled at a specified position. We give dynamic programs with…

Data Structures and Algorithms · Computer Science 2017-10-31 G. Calinescu , F. Jaehn , M. Li , K. Wang

The NP-hard MATERIAL CONSUMPTION SCHEDULING Problem and closely related problems have been thoroughly studied since the 1980's. Roughly speaking, the problem deals with minimizing the makespan when scheduling jobs that consume non-renewable…

Computer Science and Game Theory · Computer Science 2021-03-15 Matthias Bentert , Robert Bredereck , Péter Györgyi , Andrzej Kaczmarczyk , Rolf Niedermeier

We consider the weighted completion time minimization problem for capacitated parallel machines, which is a fundamental problem in modern cloud computing environments. We study settings in which the processed jobs may have varying duration,…

Distributed, Parallel, and Cluster Computing · Computer Science 2022-06-28 Ilan Reuven Cohen , Izack Cohen , Iyar Zaks

We study the computational complexity of scheduling jobs on a single speed-scalable processor with the objective of capturing the trade-off between the (weighted) flow time and the energy consumption. This trade-off has been extensively…

Data Structures and Algorithms · Computer Science 2026-02-13 Antonios Antoniadis , Denise Graafsma , Ruben Hoeksma , Maria Vlasiou

The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…

Optimization and Control · Mathematics 2023-06-16 Nodari Vakhania , Frank Werner , Alejandro Reynoso

The ever increasing adoption of mobile devices with limited energy storage capacity, on the one hand, and more awareness of the environmental impact of massive data centres and server pools, on the other hand, have both led to an increased…

Discrete Mathematics · Computer Science 2018-06-14 Rodrigo A. Carrasco , Garud Iyengar , Cliff Stein

In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the…

Computational Complexity · Computer Science 2019-07-09 Marten Maack , Klaus Jansen

The problem considered is the non-preemptive scheduling of independent jobs that consume a resource (which is non-renewable and replenished regularly) on parallel uniformly related machines. The input defines the speed of machines, size of…

Data Structures and Algorithms · Computer Science 2021-08-10 G. Jaykrishnan , Asaf Levin

In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…

Data Structures and Algorithms · Computer Science 2021-07-06 Klaus Jansen , Malin Rau

We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…

Data Structures and Algorithms · Computer Science 2017-01-27 Wenchang Luo , Taibo Luo , Randy Goebel , Guohui Lin

We consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling…

Data Structures and Algorithms · Computer Science 2018-12-03 Lin Chen , Nicole Megow , Roman Rischke , Leen Stougie , José Verschae

We study classic scheduling problems on uniformly related machines. Efficient polynomial time approximation schemes (EPTAS's) are fast and practical approximation schemes. New methods and techniques are essential in developing such improved…

Data Structures and Algorithms · Computer Science 2014-04-04 Leah Epstein , Asaf Levin

We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…

Discrete Mathematics · Computer Science 2018-11-19 T. Janssen , C. Swennenhuis , A. Bitar , T. Bosman , D. Gijswijt , L. van Iersel , S. Dauzére-Pérès , C. Yugma

Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…

Distributed, Parallel, and Cluster Computing · Computer Science 2020-04-03 Mehrnoosh Shafiee , Javad Ghaderi

An important objective in scheduling literature is to minimize the sum of weighted flow times. We are given a set of jobs where each job is characterized by a release time, a processing time, and a weight. Our goal is to find a preemptive…

Data Structures and Algorithms · Computer Science 2022-08-08 Alexander Armbruster , Lars Rohwedder , Andreas Wiese

Motivated by green manufacturing, this paper investigates a scheduling with rejection problem subject to an energy consumption constraint. Machines are associated with non-uniform energy consumption rates, defined as the energy consumed per…

Data Structures and Algorithms · Computer Science 2026-01-16 Mingyang Gong , Brendan Mumey

We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…

Data Structures and Algorithms · Computer Science 2015-03-20 Leah Epstein , Asaf Levin
‹ Prev 1 2 3 10 Next ›