Related papers: Faster Minimization of Tardy Processing Time on a …

200 papers

We consider the classical problem of Scheduling on Unrelated Machines. In this problem a set of jobs is to be distributed among a set of machines and the maximum load (makespan) is to be minimized. The processing time $p_{ij}$ of a job $j$…

Data Structures and Algorithms · Computer Science 2017-01-16 Klaus Jansen , Lars Rohwedder

In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard…

Data Structures and Algorithms · Computer Science 2023-12-07 Jesper Nederlof , Céline M. F. Swennenhuis , Karol Węgrzycki

We are given a set of $n$ jobs that have to be executed on a set of $m$ speed-scalable machines that can vary their speeds dynamically using the energy model introduced in [Yao et al., FOCS'95]. Every job $j$ is characterized by its release…

Data Structures and Algorithms · Computer Science 2014-02-18 Eric Angel , Evripidis Bampis , Vincent Chau , Nguyen Kim Thang

We study classical deadline-based preemptive scheduling of tasks in a computing environment equipped with both dynamic speed scaling and sleep state capabilities: Each task is specified by a release time, a deadline and a processing volume,…

Data Structures and Algorithms · Computer Science 2014-07-04 Antonios Antoniadis , Chien-Chung Huang , Sebastian Ott

Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…

Distributed, Parallel, and Cluster Computing · Computer Science 2020-04-03 Mehrnoosh Shafiee , Javad Ghaderi

We study the computational complexity of scheduling jobs on a single speed-scalable processor with the objective of capturing the trade-off between the (weighted) flow time and the energy consumption. This trade-off has been extensively…

Data Structures and Algorithms · Computer Science 2026-02-13 Antonios Antoniadis , Denise Graafsma , Ruben Hoeksma , Maria Vlasiou

We consider a large family of problems in which an ordering (or, more precisely, a chain of subsets) of a finite set must be chosen to minimize some weighted sum of costs. This family includes variations of Min Sum Set Cover (MSSC), several…

Data Structures and Algorithms · Computer Science 2021-06-28 Felix Happach , Lisa Hellerstein , Thomas Lidbetter

We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…

Data Structures and Algorithms · Computer Science 2016-10-27 Jessica Chang , Samir Khuller , Koyel Mukherjee

In this paper, we will find a pseudopolynomial algorithm to solve $Qm \mid \mid L_{\max}$ and then we will prove that it is impossible to get any constant-factor approximation in polynomial time, and thus also impossible to have a PTAS for…

Data Structures and Algorithms · Computer Science 2020-01-23 Elbert Du , Stan Zhang

We revisit the classic #Knapsack problem, which asks to count the Boolean points $(x_1,\dots,x_n)\in\{0,1\}^n$ in a given half-space $\sum_{i=1}^nW_ix_i\le T$. This #P-complete problem admits $(1\pm\epsilon)$-approximation. Before this…

Data Structures and Algorithms · Computer Science 2024-10-30 Weiming Feng , Ce Jin

We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the…

Data Structures and Algorithms · Computer Science 2022-05-06 Nodari Vakhania

The NP-hard scheduling problem P||C_max encompasses a set of tasks with known execution time which must be mapped to a set of identical machines such that the overall completion time is minimized. In this work, we improve existing…

Data Structures and Algorithms · Computer Science 2024-10-22 Matthew Akram , Nikolai Maas , Peter Sanders , Dominik Schreiber

We consider the two-parallel machines scheduling problem, with the aim of minimizing the maximum lateness and the makespan. Formally, the problem is defined as follows. We have to schedule a set J of n jobs on two identical machines. Each…

Data Structures and Algorithms · Computer Science 2018-03-01 Gais Alhadi , Imed Kacem , Pierre Laroche , Izzeldin M. Osman

In this paper, we investigate the use of the deep learning method for solving a well-known NP-hard single machine scheduling problem with the objective of minimizing the total tardiness. We propose a deep neural network that acts as a…

Optimization and Control · Mathematics 2024-02-28 Michal Bouška , Přemysl Šůcha , Antonín Novák , Zdeněk Hanzálek

We consider the classical problem of scheduling $n$ jobs with release dates on both single and identical parallel machines. We measure the quality of service provided to each job by its stretch, which is defined as the ratio of its response…

Data Structures and Algorithms · Computer Science 2014-06-27 Abhinav Srivastav , Denis Trystram

We consider the SUBSET SUM problem and its important variants in this paper. In the SUBSET SUM problem, a (multi-)set $X$ of $n$ positive numbers and a target number $t$ are given, and the task is to find a subset of $X$ with the maximal…

Data Structures and Algorithms · Computer Science 2022-12-07 Xiaoyu Wu , Lin Chen

Subset Sum is a classical optimization problem taught to undergraduates as an example of an NP-hard problem, which is amenable to dynamic programming, yielding polynomial running time if the input numbers are relatively small. Formally,…

Data Structures and Algorithms · Computer Science 2018-07-24 Konstantinos Koiliaris , Chao Xu

We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation…

Data Structures and Algorithms · Computer Science 2007-05-23 Philippe Baptiste , Marek Chrobak , Christoph Durr , Wojciech Jawor , Nodari Vakhania

In moldable job scheduling, we are provided $m$ identical machines and $n$ jobs that can be executed on a variable number of machines. The execution time of each job depends on the number of machines assigned to execute that job. For the…

Data Structures and Algorithms · Computer Science 2026-01-07 Klaus Jansen , Felix Ohnesorge

Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are…

Discrete Mathematics · Computer Science 2019-06-27 Marinus Gottschau , Felix Happach , Marcus Kaiser , Clara Waldmann