English
Related papers

Related papers: Faster Minimization of Tardy Processing Time on a …

200 papers

In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence…

Data Structures and Algorithms · Computer Science 2025-07-23 Nick Fischer , Leo Wennmann

We study the classical problem of minimizing the total weighted completion time on a fixed set of $m$ identical machines working in parallel, the $Pm||\sum w_jC_j$ problem in the standard three field notation for scheduling problems. This…

Data Structures and Algorithms · Computer Science 2025-02-20 Danny Hermelin , Tomohiro Koana , Dvir Shabtay

We consider the problem of minimizing the total processing time of tardy jobs on a single machine. This is a classical scheduling problem, first considered by [Lawler and Moore 1969], that also generalizes the Subset Sum problem. Recently,…

Data Structures and Algorithms · Computer Science 2023-01-18 Baruch Schieber , Pranav Sitaraman

The $1 \mid \mid \Sigma w_j U_j$ problem asks to determine -- given $n$ jobs each with its own processing time, weight, and due date -- the minimum weighted number of tardy jobs in any single machine non-preemptive schedule for these jobs.…

Data Structures and Algorithms · Computer Science 2022-09-12 Danny Hermelin , Hendrik Molter , Dvir Shabtay

The starting point of this paper is the problem of scheduling $n$ jobs with processing times and due dates on a single machine so as to minimize the total processing time of tardy jobs, i.e., $1||\sum p_j U_j$. This problem was identified…

Data Structures and Algorithms · Computer Science 2022-11-11 Kim-Manuel Klein , Adam Polak , Lars Rohwedder

We consider the $1||\sum w_J U_j$ problem, the problem of minimizing the weighted number of tardy jobs on a single machine. This problem is one of the most basic and fundamental problems in scheduling theory, with several different…

Data Structures and Algorithms · Computer Science 2024-01-04 Klaus Heeger , Danny Hermelin

In this work, we study the computational (parameterized) complexity of $P \mid r_j, p_j=p \mid \sum_j w_j U_j$. Here, we are given $m$ identical parallel machines and $n$ jobs with equal processing time, each characterized by a release…

Data Structures and Algorithms · Computer Science 2024-04-23 Klaus Heeger , Hendrik Molter

In parallel machine scheduling, we are given a set of jobs, together with a number of machines and our goal is to decide for each job, when and on which machine(s) it should be scheduled in order to minimize some objective function.…

Data Structures and Algorithms · Computer Science 2023-02-09 Klaus Jansen , Kai Kahler

We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…

Discrete Mathematics · Computer Science 2018-11-19 T. Janssen , C. Swennenhuis , A. Bitar , T. Bosman , D. Gijswijt , L. van Iersel , S. Dauzére-Pérès , C. Yugma

We consider the classic scheduling problem of minimizing the total weighted flow-time on a single machine (min-WPFT), when preemption is allowed. In this problem, we are given a set of $n$ jobs, each job having a release time $r_j$, a…

Data Structures and Algorithms · Computer Science 2018-07-27 Uriel Feige , Janardhan Kulkarni , Shi Li

We consider the following single-machine scheduling problem, which is often denoted $1||\sum f_{j}$: we are given $n$ jobs to be scheduled on a single machine, where each job $j$ has an integral processing time $p_j$, and there is a…

Data Structures and Algorithms · Computer Science 2016-12-13 Maurice Cheung , Julián Mestre , David B. Shmoys , José Verschae

This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…

Data Structures and Algorithms · Computer Science 2013-11-13 Abhishek Awasthi , Jörg Lässig , Oliver Kramer

The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…

Optimization and Control · Mathematics 2023-06-16 Nodari Vakhania , Frank Werner , Alejandro Reynoso

We study the fundamental scheduling problem $1\mid r_j\mid\sum w_j U_j$: schedule a set of $n$ jobs with weights, processing times, release dates, and due dates on a single machine, such that each job starts after its release date and we…

Data Structures and Algorithms · Computer Science 2024-08-26 Matthias Kaul , Matthias Mnich , Hendrik Molter

We study the fundamental scheduling problem $1\|\sum p_jU_j$. Given a set of $n$ jobs with processing times $p_j$ and deadlines $d_j$, the problem is to select a subset of jobs such that the total processing time is maximized without…

Data Structures and Algorithms · Computer Science 2024-02-29 Mihail Stoian

We are given a set of $n$ jobs and a single processor that can vary its speed dynamically. Each job $J_j$ is characterized by its processing requirement (work) $p_j$, its release date $r_j$ and its deadline $d_j$. We are also given a budget…

Data Structures and Algorithms · Computer Science 2013-09-09 Eric Angel , Evripidis Bampis , Vincent Chau

The Min-sum single machine scheduling problem (denoted 1||sum f_j) generalizes a large number of sequencing problems. The first constant approximation guarantees have been obtained only recently and are based on natural time-indexed LP…

Data Structures and Algorithms · Computer Science 2015-11-30 Adam Kurpisz , Samuli Leppänen , Monaldo Mastrolilli

This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…

Optimization and Control · Mathematics 2020-06-30 Arthur Kramer , Mauro Dell'Amico , Dominique Feillet , Manuel Iori

The (Non-Preemptive) Throughput Maximization problem is a natural and fundamental scheduling problem. We are given $n$ jobs, where each job $j$ is characterized by a processing time and a time window, contained in a global interval $[0,T)$,…

Data Structures and Algorithms · Computer Science 2026-04-01 Alexander Armbruster , Fabrizio Grandoni , Antoine Tinguely , Andreas Wiese

Given $N$ instances $(X_1,t_1),\ldots,(X_N,t_N)$ of Subset Sum, the AND Subset Sum problem asks to determine whether all of these instances are yes-instances; that is, whether each set of integers $X_i$ has a subset that sums up to the…

Data Structures and Algorithms · Computer Science 2020-04-28 Amir Abboud , Karl Bringmann , Danny Hermelin , Dvir Shabtay