Related papers: Weighted Completion Time Minimization for Unrelate…
We revisit the unrelated machine scheduling problem with the weighted completion time objective. It is known that independent rounding achieves a 1.5 approximation for the problem, and many prior algorithms improve upon this ratio by…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
We study approximation algorithms for scheduling problems with the objective of minimizing total weighted completion time, under identical and related machine models with job precedence constraints. We give algorithms that improve upon many…
We revisit two well-studied scheduling problems in the unrelated machines setting where each job can have a different processing time on each machine. For minimizing total weighted completion time we give a 1.45-approximation, which…
We consider the problem of scheduling jobs on unrelated machines so as to minimize the sum of weighted completion times. Our main result is a $(3/2-c)$-approximation algorithm for some fixed $c>0$, improving upon the long-standing bound of…
We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show…
We present combinatorial approximation algorithms for the weighted correlation clustering problem. In this problem, we have a set of vertices and two weight values for each pair of vertices, denoting their difference and similarity. The…
We consider the weighted completion time minimization problem for capacitated parallel machines, which is a fundamental problem in modern cloud computing environments. We study settings in which the processed jobs may have varying duration,…
We study nearly-linear time approximation algorithms for non-preemptive scheduling problems in two settings: the unrelated machine setting, and the identical machine with job precedence constraints setting, under the well-studied objectives…
We study the scheduling problem on unrelated machines in the mechanism design setting. This problem was proposed and studied in the seminal paper (Nisan and Ronen 1999), where they gave a 1.75-approximation randomized truthful mechanism for…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
Distributed computing systems often need to consider the scheduling problem involving a collection of highly dependent data-processing tasks that must work in concert to achieve mission-critical objectives. This paper considers the…
Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing…
We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite…
We describe a new dependent-rounding algorithmic framework for bipartite graphs. Given a fractional assignment $\vec x$ of values to edges of graph $G = (U \cup V, E)$, the algorithms return an integral solution $\vec X$ such that each…
This paper addresses the challenging scheduling problem of coflows with release times, with the objective of minimizing the total weighted completion time. Previous literature has predominantly concentrated on establishing the scheduling…
We give a $(2 + \epsilon)$-approximation algorithm for minimizing total weighted completion time on a single machine under release time and precedence constraints. This settles a recent conjecture made in [18]
In this work, we present a new iterative exact solution algorithm for the weighted fair sequences problem, which is a recently introduced NP-hard sequencing problem with applications in diverse areas such as TV advertisement scheduling,…
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing…