Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are…
We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job…
We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
We are concerned with the problem of scheduling $n$ jobs onto $m$ identical machines. Each machine has to be in operation for a prescribed time, and the objective is to minimize the total machine working time. Precisely, let $c_i$ be the…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
An important objective in scheduling literature is to minimize the sum of weighted flow times. We are given a set of jobs where each job is characterized by a release time, a processing time, and a weight. Our goal is to find a preemptive…
In this paper we study the classical scheduling problem of minimizing the total weighted completion time on a single machine with the constraint that one specific job must be scheduled at a specified position. We give dynamic programs with…
In this paper, we consider four single-machine scheduling problems with release times, with the aim of minimizing the maximum lateness. In the first problem we have a common deadline for all the jobs. The second problem looks for the Pareto…
The problem of attaining energy efficiency in distributed systems is of importance, but a general, non-domain-specific theory of energy-minimal scheduling is far from developed. In this paper, we classify the problems of energy-minimal…
This paper considers the scheduling of stochastic jobs on parallel identical machines to minimize the expected total weighted completion time. While this is a classical problem with a significant body of research on approximation algorithms…
The (Non-Preemptive) Throughput Maximization problem is a natural and fundamental scheduling problem. We are given $n$ jobs, where each job $j$ is characterized by a processing time and a time window, contained in a global interval $[0,T)$,…
The ever increasing adoption of mobile devices with limited energy storage capacity, on the one hand, and more awareness of the environmental impact of massive data centres and server pools, on the other hand, have both led to an increased…
We consider a recently introduced fair repetitive scheduling problem involving a set of clients, each asking for their associated job to be daily scheduled on a single machine across a finite planning horizon. The goal is to determine a job…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
While previous work on energy-efficient algorithms focused on assumption that tasks can be assigned to any processor, we initially study the problem of task scheduling on restricted parallel processors. The objective is to minimize the…
We consider the following shared-resource scheduling problem: Given a set of jobs $J$, for each $j\in J$ we must schedule a job-specific processing volume of $v_j>0$. A total resource of $1$ is available at any time. Jobs have a resource…
We study approximation algorithms for scheduling problems with the objective of minimizing total weighted completion time, under identical and related machine models with job precedence constraints. We give algorithms that improve upon many…
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…