Related papers: Approximating Weighted Completion Time for Order S…
In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence…
We study the Parallel Task Scheduling problem $Pm|size_j|C_{\max}$ with a constant number of machines. This problem is known to be strongly NP-complete for each $m \geq 5$, while it is solvable in pseudo-polynomial time for each $m \leq 3$.…
We study the problem of preemptive scheduling n jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. We show that when all jobs have equal processing times then the problem can…
This research addresses the multiprocessor scheduling problem of hard real-time systems, and it especially focuses on optimal and global schedulers when practical constraints are taken into account. First, we propose an improvement of the…
In this paper we consider a combination of the joint replenishment problem (JRP) and single machine scheduling with release dates. There is a single machine and one or more item types. Each job has a release date, a positive processing…
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…
Speed-robust scheduling is the following two-stage problem of scheduling $n$ jobs on $m$ uniformly related machines. In the first stage, the algorithm receives the value of $m$ and the processing times of $n$ jobs; it has to partition the…
In this work, we study the task of scheduling jobs on a single machine with sequence dependent family setup times under the goal of minimizing the makespan, that is, the completion time of the last job in the schedule. This notoriously…
We study online scheduling to minimize total completion time with explorable uncertainty on single and multiple machines. Each job comes with an upper limit of its processing time, which could be potentially reduced by testing the job,…
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…
A new class of multi agent single machine scheduling problems is introduced, where each job is associated with a self interested agent with a utility function decreasing in completion time. We aim to achieve a fair solution by maximizing…
We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite…
It is required to find an optimal order of constructing the edges of a network so as to minimize the sum of the weighted connection times of relevant pairs of vertices. Construction can be performed anytime anywhere in the network, with a…
We consider the problem of minimizing the weighted makespan on a single machine with restarts. Restarts are similar to preemptions but weaker: a job can be interrupted, but then it has to be run again from the start instead of resuming at…
The active-time scheduling problem considers the problem of scheduling preemptible jobs with windows (release times and deadlines) on a parallel machine that can schedule up to $g$ jobs during each timestep. The goal in the active-time…
In Polyamorous Scheduling, we are given an edge-weighted graph and must find a periodic schedule of matchings in this graph which minimizes the maximal weighted waiting time between consecutive occurrences of the same edge. This NP-hard…
The problem of attaining energy efficiency in distributed systems is of importance, but a general, non-domain-specific theory of energy-minimal scheduling is far from developed. In this paper, we classify the problems of energy-minimal…
We revisit the complexity of the classical Interval Scheduling in the dynamic setting. In this problem, the goal is to maintain a set of intervals under insertions and deletions and report the size of the maximum size subset of pairwise…
We consider a scheduling problem of strategic agents representing jobs of different weights. Each agent has to decide on one of a finite set of identical machines to get their job processed. In contrast to the common and exclusive focus on…
This paper mainly focuses on a resource leveling variant of a two-processor scheduling problem. The latter problem is to schedule a set of dependent UET jobs on two identical processors with minimum makespan. It is known to be…