Related papers: Simple Near-Optimal Scheduling for the M/G/1
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
The subject of this paper is the problem of estimating service time distribution of the $M/G/\infty$ queue from incomplete data on the queue. The goal is to estimate $G$ from observations of the queue--length process at the points of the…
Contrary to the conclusions of a recent body of work where approximate shortest remaining processing time first (SRPT) flow scheduling is advocated for datacenter networks, this paper aims to demonstrate that per-flow fairness remains a…
Modern computing workloads are often composed of parallelizable jobs. A parallelizable job can be completed more quickly when run on additional servers. However, each job can only use a limited number of servers, known as its…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
Motivated by the work of Whitt, who studied stabilization of the mean virtual waiting time (excluding service time) in a $GI_t/GI_t/1/FCFS$ queue, this paper investigates the stabilization of the mean virtual response time in a…
In this paper we propose a highly accurate approximate performance analysis of a heterogeneous server system with a processor sharing service discipline and a general job-size distribution under a generalized join the shortest queue (GJSQ)…
Virtually all practical settings where preemptive scheduling is employed are susceptible to preemption overhead, and accounting for these overheads is necessary to make informed scheduling design decisions. However, preemption overhead is…
We consider the stochastic scheduling problem of minimizing the expected makespan on $m$ parallel identical machines. While the (adaptive) list scheduling policy achieves an approximation ratio of $2$, any (non-adaptive) fixed assignment…
In this paper we describe a perfect simulation algorithm for the stable $M/G/c$ queue. Sigman (2011: Exact Simulation of the Stationary Distribution of the FIFO M/G/c Queue. Journal of Applied Probability, 48A, 209--213) showed how to build…
In modern computing systems, jobs' resource requirements often vary over time. Accounting for this temporal variability during job scheduling is essential for meeting performance goals. However, theoretical understanding on how to schedule…
We present a new framework for designing nonpreemptive and job-size oblivious scheduling policies in the multiserver-job queueing model. The main requirement is to identify a static and balanced sub-partition of the server set and ensure…
We consider the Pm || Cmax scheduling problem where the goal is to schedule n jobs on m identical parallel machines to minimize makespan. We revisit the famous Longest Processing Time (LPT) rule proposed by Graham in 1969. LPT requires to…
We study the single machine scheduling problem with the objective to minimize the total weight of late jobs. It is assumed that the processing times of jobs are not exactly known at the time when a complete schedule must be dispatched.…
We consider a G/G/1 queueing system with a single server, where updates arrive from different sources stochastically with possibly different update inter-generation time distributions. The server can transmit/serve at most one update at any…
Load balancing systems, comprising a central dispatcher and a scheduling policy at each server, are widely used in practice, and their response time has been extensively studied in the theoretical literature. While much is known about the…
We consider the following general scheduling problem: The input consists of n jobs, each with an arbitrary release time, size, and a monotone function specifying the cost incurred when the job is completed at a particular time. The…
We study the general scheduling problem (GSP) which generalizes and unifies several well-studied preemptive single-machine scheduling problems, such as weighted flow time, weighted sum of completion time, and minimizing the total weight of…
The (Non-Preemptive) Throughput Maximization problem is a natural and fundamental scheduling problem. We are given $n$ jobs, where each job $j$ is characterized by a processing time and a time window, contained in a global interval $[0,T)$,…
Approximations for the mean performance indices for the M/G/c queue rely on the approximate computation of the probability that an arriving request has to wait for service and of the minimum of residual service times if all servers are…