Related papers: Makespan Minimization with OR-Precedence Constrain…
We consider the problem of efficiently scheduling jobs with precedence constraints on a set of identical machines in the presence of a uniform communication delay. Such precedence-constrained jobs can be modeled as a directed acyclic graph,…
Makespan minimization on unrelated machines is a classic problem in approximation algorithms. No polynomial time $(2-\delta)$-approximation algorithm is known for the problem for constant $\delta> 0$. This is true even for certain special…
This paper presents improved approximation algorithms for the problem of multiprocessor scheduling under uncertainty, or SUU, in which the execution of each job may fail probabilistically. This problem is motivated by the increasing use of…
We consider the $\mathcal{NP}$-hard problem $\mathrm{P} \mathbf{\vert} \mathrm{pmtn, setup=s_i} \mathbf{\vert} \mathrm{C_{\max}}$, the problem of scheduling $n$ jobs, which are divided into $c$ classes, on $m$ identical parallel machines…
Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are…
We present a $\sqrt{e}/(\sqrt{e}-1)$-approximation algorithm for the nonpreemptive scheduling problem to minimize the total weighted completion time of jobs on a single machine subject to release dates and precedence constraints. The…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
Consider the problem in which n jobs that are classified into k types are to be scheduled on m identical machines without preemption. A machine requires a proper setup taking s time units before processing jobs of a given type. The…
Scheduling jobs with precedence constraints on a set of identical machines to minimize the total processing time (makespan) is a fundamental problem in combinatorial optimization. In practical settings such as cloud computing, jobs are…
We consider a recently introduced fair repetitive scheduling problem involving a set of clients, each asking for their associated job to be daily scheduled on a single machine across a finite planning horizon. The goal is to determine a job…
We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite…
In this paper we consider the open shop scheduling problem where the jobs have delivery times. The minimization criterion is the maximum lateness of the jobs. This problem is known to be NP-hard, even restricted to only 2 machines. We…
We consider a single machine scheduling problem that seeks to minimize a generalized cost function: given a subset of jobs we must order them so as to minimize $\sum f_j(C_j)$, where $C_j$ is the completion time of job $j$ and $f_j$ is a…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
In moldable job scheduling, we are provided $m$ identical machines and $n$ jobs that can be executed on a variable number of machines. The execution time of each job depends on the number of machines assigned to execute that job. For the…
We consider the following special case of minimizing makespan. A set of jobs $J$ and a set of machines $M$ are given. Each job $j \in J$ can be scheduled on a machine from a subset $M_j$ of $M$. The processing time of $j$ is the same on all…
We consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the…
We study the classic problem of scheduling $n$ precedence constrained unit-size jobs on $m = O(1)$ machines so as to minimize the makespan. In a recent breakthrough, Levey and Rothvoss \cite{LR16} developed a $(1+\epsilon)$-approximation…