This paper considers the integrated problem of quay crane assignment, quay crane scheduling, yard location assignment, and vehicle dispatching operations at a container terminal. The main objective is to minimize vessel turnover times and…
We consider the problem of scheduling a set of $n$ tasks on $m$ processors under precedence, communication, and global system energy constraints to minimize makespan. We extend existing scheduling models to account for energy usage and give…
The technical report presents a generic exact solution approach for minimizing the project duration of the resource-constrained project scheduling problem with generalized precedences (Rcpsp/max). The approach uses lazy clause generation,…
High Speed computing meets ever increasing real-time computational demands through the leveraging of flexibility and parallelism. The flexibility is achieved when computing platform designed with heterogeneous resources to support…
For the past decade, HENP experiments have been heading towards a distributed computing model in an effort to concurrently process tasks over enormous data sets that have been increasing in size as a function of time. In order to optimize…
Consumer-electronics systems are becoming increasingly complex as the number of integrated applications is growing. Some of these applications have real-time requirements, while other non-real-time applications only require good average…
Robots operate under significant uncertainty, from quantifiable noise to unquantifiable unknowns, and must account for strict operational constraints, such as limited resources. In this paper, we consider the problem of synthesizing robust…
We consider a problem of multi-product scheduling in production. Each product can be produced by a family of alternative multi-machine technologies. Multi-machine technologies require more than one machine at the same time. A sequence…
The manpower scheduling problem is a critical research field in the resource management area. Based on the existing studies on scheduling problem solutions, this paper transforms the manpower scheduling problem into a combinational…
Modeling scheduling problems with conditional time intervals and cumulative functions has become a common approach when using modern commercial constraint programming solvers. This paradigm enables the modeling of a wide range of scheduling…
As in-space exploration increases, autonomous systems will play a vital role in building the necessary facilities to support exploration. To this end, an autonomous system must be able to assign tasks in a scheme that efficiently completes…
The CLP scheme uses Horn clauses and SLD resolution to generate multiple constraint satisfaction problems (CSPs). The possible CSPs include rational trees (giving Prolog) and numerical algorithms for solving linear equations and linear…
The increase in non-renewable energy consumption and CO2 emissions, especially in the manufacturing sector, is moving radical shifts in energy supply policies and production models. Renewable energy integration and regulated pricing…
The NP-hard MATERIAL CONSUMPTION SCHEDULING Problem and closely related problems have been thoroughly studied since the 1980's. Roughly speaking, the problem deals with minimizing the makespan when scheduling jobs that consume non-renewable…
Ensuring flexible and efficient manufacturing of customized products in an increasing dynamic and turbulent environment without sacrificing cost effectiveness, product quality and on-time delivery has become a key issue for most industrial…
Organizations around the world schedule jobs (programs) regularly to perform various tasks dictated by their end users. With the major movement towards using a cloud computing infrastructure, our organization follows a hybrid approach with…
The classical Job Shop Scheduling Problem (JSSP) focuses on optimizing makespan under deterministic constraints. Real-world production environments introduce additional complexities that cause traditional scheduling approaches to be less…
Extreme dynamic heterogeneity in high performance computing systems and the convergence of traditional HPC with new simulation, analysis, and data science approaches impose increasingly more complex requirements on resource and job…
Stochastic Processing Networks (SPNs) can be used to model communication networks, manufacturing systems, service systems, etc. We consider a real-time SPN where tasks generate jobs with strict deadlines according to their traffic patterns.…
Real-time scheduling algorithms proposed in the literature are often based on worst-case estimates of task parameters. The performance of an open-loop scheme can be degraded significantly if there are uncertainties in task parameters, such…