Related papers: Prepare for the Expected Worst: Algorithms for Rec…
This paper considers structural optimization under a reliability constraint, where the input distribution is only partially known. Specifically, when we only know that the expected value vector and the variance-covariance matrix of the…
Engineering design involves demanding models encompassing many decision variables and uncontrollable parameters. In addition, unavoidable aleatoric and epistemic uncertainties can be very impactful and add further complexity. The…
Parallel machine scheduling has been extensively studied in the past decades, with applications ranging from production planning to job processing in large computing clusters. In this work we study some of these fundamental optimization…
We consider here the MultiBot problem for the scheduling and the resource parametrization of jobs related to the production or the transportation of different products inside a given time horizon. Those jobs must meet known in advance…
Finding the optimally performing configuration of a software system for a given setting is often challenging. Recent approaches address this challenge by learning performance models based on a sample set of configurations. However, building…
We study a general problem of allocating limited resources to heterogeneous customers over time under model uncertainty. Each type of customer can be serviced using different actions, each of which stochastically consumes some combination…
In the current work we introduce a novel estimation of distribution algorithm to tackle a hard combinatorial optimization problem, namely the single-machine scheduling problem, with uncertain delivery times. The majority of the existing…
In robust optimization, the general aim is to find a solution that performs well over a set of possible parameter outcomes, the so-called uncertainty set. In this paper, we assume that the uncertainty size is not fixed, and instead aim at…
Random cost simulations were introduced as a method to investigate optimization problems in systems with conflicting constraints. Here I study the approach in connection with the training of a feed-forward multilayer perceptron, as used in…
Urban infrastructure degrades over time, necessitating periodic renovation to maintain functionality and safety. When renovation is delayed beyond the infrastructure's remaining lifespan, costly emergency interventions become necessary to…
This paper studies online resource allocation with replenishable budgets, where budgets can be replenished on top of the initial budget and an agent sequentially chooses online allocation decisions without violating the available budget…
Mine planning is a complex task that involves many uncertainties. During early stage feasibility, available mineral resources can only be estimated based on limited sampling of ore grades from sparse drilling, leading to large uncertainty…
We study stochastic combinatorial optimization problems where the objective is to minimize the expected maximum load (a.k.a.\ the makespan). In this framework, we have a set of $n$ tasks and $m$ resources, where each task $j$ uses some…
We study the design of resilient and reliable communication networks in which a signal can be transferred only up to a limited distance before its quality falls below an acceptable threshold. When excessive signal degradation occurs,…
We propose a new Robust Optimization method for the energy offering problem of a price-taker generating company that wants to build offering curves for its generation units, in order to maximize its profit while taking into account the…
We study two online resource allocation problems with reusability in an adversarial setting, namely kRental-Fixed and kRental-Variable. In both problems, a decision-maker manages $k$ identical reusable units and faces a sequence of rental…
In this paper, an optimization problem with uncertain constraint coefficients is considered. Possibility theory is used to model the uncertainty. Namely, a joint possibility distribution in constraint coefficient realizations, called…
In this paper the problem of selecting $p$ out of $n$ available items is discussed, such that their total cost is minimized. We assume that costs are not known exactly, but stem from a set of possible outcomes. Robust recoverable and…
Because of increasing amounts of intermittent and distributed generators in power systems, many demand response programs have been developed to schedule flexible energy consumption. However, proper benchmarks for comparing these methods are…
Healthcare systems are facing serious challenges in balancing their human resources to cope with volatile service demand, while at the same time providing necessary job satisfaction to the healthcare workers. We propose in this paper a…