We present the first near optimal approximation schemes for the maximum weighted (uncapacitated or capacitated) $b$--matching problems for non-bipartite graphs that run in time (near) linear in the number of edges. For any…
We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
We consider here the MultiBot problem for the scheduling and the resource parametrization of jobs related to the production or the transportation of different products inside a given time horizon. Those jobs must meet known in advance…
The Map-Reduce computing framework rose to prominence with datasets of such size that dozens of machines on a single cluster were needed for individual jobs. As datasets approach the exabyte scale, a single job may need distributed…
Generalizing many well-known and natural scheduling problems, scheduling with job-specific cost functions has gained a lot of attention recently. In this setting, each job incurs a cost depending on its completion time, given by a private…
A prominent problem in scheduling theory is the weighted flow time problem on one machine. We are given a machine and a set of jobs, each of them characterized by a processing time, a release time, and a weight. The goal is to find a…
We study ordinal makespan scheduling on small numbers of identical machines, with respect to two parallel solutions. In ordinal scheduling, it is known that jobs are sorted by non-increasing sizes, but the specific sizes are not known in…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
In parallel machine scheduling, we are given a set of jobs, together with a number of machines and our goal is to decide for each job, when and on which machine(s) it should be scheduled in order to minimize some objective function.…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
We study the problem of scheduling $n$ independent moldable tasks on $m$ processors that arises in large-scale parallel computations. When tasks are monotonic, the best known result is a $(\frac{3}{2}+\epsilon)$-approximation algorithm for…
We introduce the following elementary scheduling problem. We are given a collection of n jobs, where each job has an integer length as well as a set Ti of time intervals in which it can be feasibly scheduled. Given a parameter B, the…
We study the precedence-constrained resource scheduling problem [SICOMP'75]. There are $n$ jobs where each job takes a certain time to finish and has a resource requirement throughout the execution time. There are precedence among the jobs.…
A very well-known machine model in scheduling allows the machines to be unrelated, modelling jobs that might have different characteristics on each machine. Due to its generality, many optimization problems of this form are very difficult…
The problem considered is the non-preemptive scheduling of independent jobs that consume a resource (which is non-renewable and replenished regularly) on parallel uniformly related machines. The input defines the speed of machines, size of…
In this paper we consider the open shop scheduling problem where the jobs have delivery times. The minimization criterion is the maximum lateness of the jobs. This problem is known to be NP-hard, even restricted to only 2 machines. We…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…
One of the most important open problems in machine scheduling is the problem of scheduling a set of jobs on unrelated machines to minimize the makespan. The best known approximation algorithm for this problem guarantees an approximation…