Related papers: Scheduling on (Un-)Related Machines with Setup Tim…
We consider offline scheduling algorithms that incorporate speed scaling to address the bicriteria problem of minimizing energy consumption and a scheduling metric. For makespan, we give linear-time algorithms to compute all non-dominated…
We consider the classical makespan minimization scheduling problem where $n$ jobs must be scheduled on $m$ identical machines. Using weighted random sampling, we developed two sublinear time approximation schemes: one for the case where $n$…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
This paper studies the scheduling of jobs of different families on parallel machines with qualification constraints. Originating from semiconductor manufacturing, this constraint imposes a time threshold between the execution of two jobs of…
In real-time systems, in addition to the functional correctness recurrent tasks must fulfill timing constraints to ensure the correct behavior of the system. Partitioned scheduling is widely used in real-time systems, i.e., the tasks are…
Motivated by issues of saving energy in data centers we define a collection of new problems referred to as "machine activation" problems. The central framework we introduce considers a collection of $m$ machines (unrelated or related) with…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard…
This paper addresses a production scheduling problem derived from an industrial use case, focusing on unrelated parallel machine scheduling with the personnel availability constraint. The proposed model optimizes the production plan over a…
This paper considers the online machine minimization problem, a basic real time scheduling problem. The setting for this problem consists of n jobs that arrive over time, where each job has a deadline by which it must be completed. The goal…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
We study envy-free mechanisms for scheduling tasks on unrelated machines (agents) that approximately minimize the makespan. For indivisible tasks, we put forward an envy-free poly-time mechanism that approximates the minimal makespan to…
We consider a 1-machine scheduling problem where the temperature of a job rises during processing, and cools down when not being processed according to given linear heating and cooling rates. No job's temperature is allowed to rise above a…
We consider the makespan minimization coupled-tasks problem in presence of compatibility constraints with a specified topology. In particular, we focus on stretched coupled-tasks, i.e. coupled-tasks having the same sub-tasks execution time…
In this paper we study a single machine scheduling problem with the objective of minimizing the sum of completion times. Each of the given jobs is either short or long. However the processing times are initially hidden to the algorithm, but…
We study the problem of scheduling $m$ tasks to $n$ selfish, unrelated machines in order to minimize the makespan, where the execution times are independent random variables, identical across machines. We show that the VCG mechanism, which…
We study the Parallel Task Scheduling problem $Pm|size_j|C_{\max}$ with a constant number of machines. This problem is known to be strongly NP-complete for each $m \geq 5$, while it is solvable in pseudo-polynomial time for each $m \leq 3$.…
Generalizing many well-known and natural scheduling problems, scheduling with job-specific cost functions has gained a lot of attention recently. In this setting, each job incurs a cost depending on its completion time, given by a private…
Various new scheduling problems have been arising from practical production processes and spawning new research areas in the scheduling field. We study the parallel multi-stage open shops problem, which generalizes the classic open shop…
We propose constant approximation algorithms for generalizations of the Flexible Flow Shop (FFS) problem which form a realistic model for non-preemptive scheduling in MapReduce systems. Our results concern the minimization of the total…
We consider the classic problem of scheduling jobs with precedence constraints on a set of identical machines to minimize the makespan objective function. Understanding the exact approximability of the problem when the number of machines is…