We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
We consider a generalization of the unsplittable maximum two-commodity flow problem on undirected graphs where each commodity $i\in{1,2}$ can be split into a bounded number $k_i$ of equally-sized chunks that can be routed on different…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
In the Scheduling Machines with Capacity Constraints problem, we are given k identical machines, each of which can process at most m_i jobs. M jobs are also given, where job j has a non-negative processing time length t_j >= 0. The task is…
We consider the following single-machine scheduling problem, which is often denoted $1||\sum f_{j}$: we are given $n$ jobs to be scheduled on a single machine, where each job $j$ has an integral processing time $p_j$, and there is a…
We consider the classic scheduling problem of minimizing the total weighted flow-time on a single machine (min-WPFT), when preemption is allowed. In this problem, we are given a set of $n$ jobs, each job having a release time $r_j$, a…
We study flow shop scheduling with stochastic reentry, where jobs must complete multiple passes through the entire shop, and the number of passes that a job requires for completion is drawn from a discrete probability distribution. The goal…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
We are given a set of $n$ jobs that have to be executed on a set of $m$ speed-scalable machines that can vary their speeds dynamically using the energy model introduced in [Yao et al., FOCS'95]. Every job $j$ is characterized by its release…
Since its development in the early 90's, parameterized complexity has been widely used to analyze the tractability of many NP-hard combinatorial optimization problems with respect to various types of problem parameters. While the generic…
We study the general scheduling problem (GSP) which generalizes and unifies several well-studied preemptive single-machine scheduling problems, such as weighted flow time, weighted sum of completion time, and minimizing the total weight of…
We study shared multi-processor scheduling problem where each job can be executed on its private processor and simultaneously on one of many processors shared by all jobs in order to reduce the job's completion time due to processing time…
In the $2$-Machine Flow Shop problem with exact delays the operations of each job are separated by a given time lag (delay). Leung et al. (2007) established that the problem is strongly NP-hard when the delays may have at most two different…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
In this paper we consider the problem of scheduling on parallel machines with a presence of incompatibilities between jobs. The incompatibility relation can be modeled as a complete multipartite graph in which each edge denotes a pair of…
In this paper we study a scheduling problem arising from executing numerical simulations on HPC architectures. With a constant number of parallel machines, the objective is to minimize the makespan under memory constraints for the machines.…
This paper studies a single-machine scheduling problem with a non-renewable resource (NR-SSP) and total weighted completion time criterion. The non-renewable resource is consumed when the machine starts processing a job. We consider the…
Flowshop machine scheduling has been of main interest in several applications where the timing of its processes plays a fundamental role in the utilization of system resources. Addressing the optimal sequencing of the jobs when equivalent…