This paper concerns the risk-aware control of stochastic systems with temporal logic specifications dynamically assigned during runtime. Conventional risk-aware control typically assumes that all specifications are predefined and remain…
Significant outages from weather and climate extremes have highlighted the critical need for resilience-centered risk management of the grid. This paper proposes a multi-stage stochastic robust optimization (SRO) model that advances the…
This paper studies a risk-sensitive decision-making problem under uncertainty. It considers a decision-making process that unfolds over a fixed number of stages, in which a decision-maker chooses among multiple alternatives, some of which…
We study logistical investment flexibility provided by modular processing technologies for mitigating risk. Specifically, we propose a multi-stage stochastic programming formulation that determines optimal capacity expansion plans that…
We study a class of two-stage stochastic programs in which the second stage includes a set of components with uncertain capacity, and the expression for the distribution function of the uncertain capacity includes first-stage variables.…
Power systems Unit Commitment (UC) problem determines the generator commitment schedule and dispatch decisions for power networks based on forecasted electricity demand. However, with the increasing penetration of renewables and stochastic…
In this paper, we consider a multistage expected utility maximization problem where the decision maker's utility function at each stage depends on historical data and the information on the true utility function is incomplete. To mitigate…
To integrate strategic, tactical and operational decisions, the two-stage optimization has been widely used to guide dynamic decision making. In this paper, we study the two-stage stochastic programming for complex systems with unknown…
The type of decision dependent uncertainties (DDUs) imposes a great challenge in decision making, while existing methodologies are not sufficient to support many real practices. In this paper, we present a systematic study to handle this…
Accurate performance estimation of future many-node machines is challenging because it requires detailed simulation models of both node and network. However, simulating the full system in detail is unfeasible in terms of compute and memory…
The decarbonization of energy systems at energy-intensive sites is an essential component of global climate mitigation, yet such transitions involve substantial capital requirements, ongoing technological progress, and the operational…
The supply of electrical energy is being increasingly sourced from renewable generation resources. The variability and uncertainty of renewable generation, compared to a dispatch-able plant, is a significant dissimilarity of concern to the…
In order to reduce the energy cost of data centers, recent studies suggest distributing computation workload among multiple geographically dispersed data centers, by exploiting the electricity price difference. However, the impact of data…
As the penetration of distributed energy resources (DERs) increases, harnessing their flexibility becomes critical for power system operations. Virtual power plants (VPPs) offer a promising solution. However, most existing scheduling tools…
Integrating volatile renewable energy resources into the bulk power grid is challenging, due to the reliability requirement that at each instant the load and generation in the system remain balanced. In this study, we tackle this challenge…
Phase balancing is essential to safe power system operation. We consider a substation connected to multiple phases, each with single-phase loads, generation, and energy storage. A representative of the substation operates the system and…
A standard assumption in multistage stochastic programming is that decisions are made after observing the uncertainty from the prior stage. The resulting solutions can be difficult to implement in practice, as they leave practitioners…
Decarbonisation is driving dramatic growth in renewable power generation. This increases uncertainty in the load to be served by power plants and makes their efficient scheduling, known as the unit commitment (UC) problem, more difficult.…
In this paper we analyze the effect of two modelling approaches for supply planning problems under uncertainty: two-stage stochastic programming (SP) and robust optimization (RO). The comparison between the two approaches is performed…
The problem of multi-area interchange scheduling in the presence of stochastic generation and load is considered. A new interchange scheduling technique based on a two-stage stochastic minimization of overall expected operating cost is…