Related papers: High Rate RPC detector for LHC
At the High Luminosity LHC (HL-LHC), the CMS experiment will need to operate at up to 200 interactions per 25 ns beam crossing time and with up to 4000 fb-1 of integrated luminosity. To achieve the physics goals the experiment needs to…
The High Luminosity LHC (HL-LHC) will integrate 10 times more luminosity than the LHC, posing significant challenges for radiation tolerance and event pileup on detectors, especially for forward calorimetry, and hallmarks the issue for…
Chapter 7 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in…
It is expected that the LHC accelerator and experiments will undergo a luminosity upgrade which will commence after several years of running. This part of the LHC operations is referred to as Super-LHC (SLHC) and is expected to provide…
Chapter 12 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in…
The Large Hadron Collider (LHC) at CERN will undergo major upgrades to increase the instantaneous luminosity up to 5-7.5$\times10^{34}$ cm$^{-2}$s$^{-1}$. This High Luminosity upgrade of the LHC (HL-LHC) will deliver a total of 3000-4000…
This paper has the purpose to study the rate capability of the Resistive Plate Chamber, RPC, starting from the basic physics of this detector. The effect of different working parameters determining the rate capability is analysed in detail,…
The PhaseII Upgrades of CMS are being planned for the High Luminosity LHC (HL-LHC) era when the mean number of interactions per beam crossing ("in-time pileup") is expected to reach ~140-200. The potential backgrounds arising from…
In the framework of the High Luminosity LHC upgrade program, the CMS muon group built several different RPC prototypes that are now under test at the new CERN Gamma Irradiation Facility (GIF++). A dedicated Detector Control System has been…
The CMS experiment has been designed with a two-level trigger system: the Level-1 Trigger, implemented on custom-designed electronics, and the High Level Trigger, a streamlined version of the CMS offline reconstruction software running on a…
The High Luminosity upgrade of the CERN Large Hadron Collider (HL-LHC) requires new high-radiation tolerant silicon pixel sensors for the innermost part of the tracking detector in the CMS experiment. The innermost layer of the tracker,…
The increased particle flux at the high luminosity phase of the Large Hadron Collider (HL-LHC), with instantaneous luminosities of up to 7.5 times the original design value, will have an impact on many sub-systems of the ATLAS detector.…
Chapter 15 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in…
To meet the need for a high counting rate and high time resolution in future high-energy physics experiments, a prototype of a gas photodetector with an RPC structure was developed. Garfield++ simulated the detector's performance, and the…
The Pixel Luminosity Telescope is a silicon pixel detector dedicated to luminosity measurement at the CMS experiment at the LHC. It is located approximately 1.75 m from the interaction point and arranged into 16 "telescopes", with eight…
The High Luminosity upgrade of the CERN Large Hadron Collider will be able to reach a peak instantaneous luminosity of 5E34/cm2 s. The innermost detectors of the CMS and ATLAS experiments will have to cope with unprecedented requirements on…
Chapter 8 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in…
A new type of Time Projection Chamber (TPC) has been proposed for the upgrade of the ALICE (A Large Ion Collider Experiment at CERN) so as to cater to the high luminosity environment expected at the Large Hadron Collider (LHC) facility in…
The high-luminosity upgrade of the CERN LHC requires the replacement of the CMS tracking detector to cope with the increased radiation fluence while maintaining its excellent performance. An extensive R\&D program, aiming at using 3D pixel…
The LHC detectors are well into their construction phase. The LHC schedule shows first beam to ATLAS and CMS in 2007. Because the LHC accelerator has begun to plan for a ten fold increase in LHC design luminosity (the SLHC or super LHC) it…