Related papers: PIP-II Injector Test Warm Front End: Commissioning…
One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H- bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1…
The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC…
The Fermilab Proton Source machines, constituted by Pre-Injector, conventional Linac and Booster synchrotron, at Fermi National Accelerator Laboratory (Fermilab) had have a long history of successful beam operations. Built in late '60s, the…
From 2005 through 2012, the Fermilab Main Injector provided intense beams of 120 GeV protons to produce neutrino beams and antiprotons. Hardware improvements in conjunction with improved diagnostics allowed the system to reach sustained…
A new experimental area designed to develop, test and verify muon ionization cooling apparatus using the 400-MeV Fermilab Linac proton beam has been fully installed and is presently being commissioned. Initially, this area was used for…
The Proton Improvement Plan II (PIP-II) project is a vital upgrade to the Fermilab accelerator complex. The magnet pulse rate of the PIP-II Injection system requires an increase from the current rate of 15 Hz to 20 Hz as well as a roughly…
This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development…
This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice…
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into…
The Proton Improvement Plan II (PIPII) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beams for neutrino production. The Linac requires cooling at 80 K, 5 K, and 2 K temperatures, which will…
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT…
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the…
The intensities and profiles of the muon beam behind the beam dump of the Fermilab test beam area when the facility is running in the "pion" beam mode are measured and summarized in this note. This muon beam with momenta in the range 10 -…
The Proton Improvement Plan - II (PIP-II) is a new linear accelerator (LINAC) complex being built at Fermilab. It is based on superconducting radiofrequency cavities and will accelerate H- ions to 800 MeV kinetic energy before injection…
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and…
Active discussion on the high energy physics priorities in the US carried out since summer of 2013 resulted in changes in Fermilab plans for future development of the existing accelerator complex. In particular, the scope of Project X was…
The 10 MeV accelerator-driven subcritical system (ADS) Injector-I test stand at Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrate one of the two injector design schemes [Injector Scheme-I, which works at…
The PLS-II has a 100 MeV pre-injector for the 3 GeV Linac. A thermionic gun produces electron charge of 200 pC with a bunch duration of 500 ps by a 250 ps triggering pulser. At the pre-injector, one of the most important beam parameters to…
Fermilab has been working with the international particle physics and nuclear physics communities to explore and develop research programs possible with a new high intensity proton source known as "Project-X". Project X will provide…
The intensity of charged particle beams at Fermilab must be kept within pre-determined safety and operational envelopes in part by assuring all beam within a few percent has been transported from any source to destination. Beam intensity…