In project scheduling under processing times uncertainty, the Anchor-Robust Project Scheduling Problem is to find a baseline schedule of bounded makespan and a max-weight subset of jobs whose starting times are guaranteed. The problem was…
While previous work on energy-efficient algorithms focused on assumption that tasks can be assigned to any processor, we initially study the problem of task scheduling on restricted parallel processors. The objective is to minimize the…
Real-time scheduling and locking protocols are fundamental facilities to construct time-critical systems. For parallel real-time tasks, predictable locking protocols are required when concurrent sub-jobs mutually exclusive access to shared…
In this paper, we tackle the problem of multi-cell resource scheduling, where the objective is to maximize the weighted sum-rate through inter-cell interference coordination (ICIC). The blanking method is used to mitigate the inter-cell…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
The problem of high-dimensional path-dependent optimal stopping (OS) is important to multiple academic communities and applications. Modern OS tasks often have a large number of decision epochs, and complicated non-Markovian dynamics,…
Locking protocol is an essential component in resource management of real-time systems, which coordinates mutually exclusive accesses to shared resources from different tasks. Although the design and analysis of locking protocols have been…
We study fundamental block-structured integer programs called tree-fold and multi-stage IPs. Tree-fold IPs admit a constraint matrix with independent blocks linked together by few constraints in a recursive pattern; and transposing their…
For a given set of intervals on the real line, we consider the problem of ordering the intervals with the goal of minimizing an objective function that depends on the exposed interval pieces (that is, the pieces that are not covered by…
We consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling…
We consider optimal route planning when the objective function is a general nonlinear and non-monotonic function. Such an objective models user behavior more accurately, for example, when a user is risk-averse, or the utility function needs…
The classic algorithm [Papadimitriou, J.ACM '81] for IPs has a running time $n^{O(m)}(m\cdot\max\{\Delta,\|\textbf{b}\|_{\infty}\})^{O(m^2)}$, where $m$ is the number of constraints, $n$ is the number of variables, and $\Delta$ and…
We are given a set of $n$ jobs and a single processor that can vary its speed dynamically. Each job $J_j$ is characterized by its processing requirement (work) $p_j$, its release date $r_j$ and its deadline $d_j$. We are also given a budget…
The problem considered in this work consists in scheduling a set of tasks on a single machine, around an unrestrictive common due date to minimize the weighted sum of earliness and tardiness. This problem can be formulated as a compact…
We consider a capacitated job shop problem with order acceptance. This research is motivated by the management of a research and development project pipeline for a company in the agricultural industry whose success depends on regularly…
Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are…
The winner determination problems of many attractive multi-winner voting rules are NP-complete. However, they often admit polynomial-time algorithms when restricting inputs to be single-peaked. Commonly, such algorithms employ dynamic…
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…
This paper studies an online optimal resource reservation problem in communication networks with job transfers where the goal is to minimize the reservation cost while maintaining the blocking cost under a certain budget limit. To tackle…
We present an efficient reduction from the Bounded integer programming (BIP) to the Subspace avoiding problem (SAP) in lattice theory. The reduction has some special properties with some interesting consequences. The first is the new upper…