This paper addresses a central challenge of jointly considering shorter-term (e.g. hourly) and longer-term (e.g. yearly) uncertainties in power system planning with increasing penetration of renewable and storage resources. In conventional…
Unit maintenance and unit commitment are two critical and interrelated aspects of electric power system operation, both of which face the challenge of coordinating efforts to enhance reliability and economic performance. This challenge…
This paper addresses two vital issues which are barely discussed in the literature on robust unit commitment (RUC): 1) how much the potential operational loss could be if the realization of uncertainty is beyond the prescribed uncertainty…
The deep penetration of wind and solar power is a critical component of the future power grid. However, the intermittency and stochasticity of these renewable resources bring significant challenges to the reliable and economic operation of…
Uncertainty sets are at the heart of robust optimization (RO) because they play a key role in determining the RO models' tractability, robustness, and conservativeness. Different types of uncertainty sets have been proposed that model…
This paper proposes a reformulation of the scenario-based two-stage unit commitment problem under uncertainty that allows finding unit-commitment plans that perform reasonably well both in expectation and for the worst case realization of…
In this paper, we develop a two-stage data-driven approach to address the adjustable robust optimization problem, where the uncertainty set is adjustable to manage infeasibility caused by significant or poorly quantified uncertainties. In…
The growing uncertainty from renewable power and electricity demand brings significant challenges to unit commitment (UC). While various advanced forecasting and optimization methods have been developed to predict better and address this…
Keeping the balance between supply and demand is a fundamental task in power system operational planning practices. This task becomes particularly challenging due to the deepening penetration of renewable energy resources, which induces a…
Optimization models have been broadly used within side the energy industry as useful decision-making systems for scheduling and dispatching electric powered energy resources; this is applied in a system called unit commitment (UC). Unit…
In the face of extreme events, e.g., hurricanes, the transmission systems, especially the transmission lines, are affected across time and space. To mitigate these impacts on the day-ahead market from a probabilistic perspective, a…
In this paper, we present and study a robust unit commitment model and some variants that consider complex temperature and demand uncertainties. Since there is a strong relationship among the efficiency of gas generators, demand, and…
Day-ahead scheduling of electricity generation or unit commitment is an important and challenging optimization problem in power systems. Variability in net load arising from the increasing penetration of renewable technologies have…
Traditional end-to-end contextual robust optimization models are trained for specific contextual data, requiring complete retraining whenever new contextual information arrives. This limitation hampers their use in online decision-making…
The type of decision dependent uncertainties (DDUs) imposes a great challenge in decision making, while existing methodologies are not sufficient to support many real practices. In this paper, we present a systematic study to handle this…
Robust optimization (RO) provides a principled framework for decision-making under uncertainty, but its performance critically depends on the choice of the uncertainty set. While large sets ensure reliability, they often lead to overly…
Unit commitment (UC) optimizes the start-up and shutdown schedules of generating units to meet load demand while minimizing costs. However, the increasing integration of renewable energy introduces uncertainties for real-time scheduling.…
Robust optimization (RO) tackles data uncertainty by optimizing for the worst-case scenario of an uncertain parameter and, in its basic form, is sometimes criticized for producing overly-conservative solutions. To reduce the level of…
With the integration of large-scale renewable energy sources to power systems, many optimization methods have been applied to solve the stochastic/uncertain transmission-constrained unit commitment (TCUC) problem. Among all methods,…
This paper addresses the transmission network expansion planning problem under uncertain demand and generation capacity. A two-stage adaptive robust optimization framework is adopted whereby the worst-case operating cost is accounted for…