We present a heuristic algorithm for solving the problem of scheduling plans of tasks. The plans are ordered vectors of tasks, and tasks are basic operations carried out by resources. Plans are tied by temporal, precedence and resource…
In this paper, we focus on the solution of a hard single machine scheduling problem by new heuristic algorithms embedding techniques from machine learning field and scheduling theory. These heuristics transform an instance of the hard…
Existing research on single-machine scheduling is largely focused on exact algorithms, which perform well on typical instances but can significantly deteriorate on certain regions of the problem space. In contrast, data-driven approaches…
This paper revisits the well known single machine scheduling problem to minimize total weighted completion times. The twist is that job sizes are stochastic from unknown distributions, and the scheduler has access to only a single sample…
We consider a distributed computing network consisting of a master and multiple workers processing tasks of different types. The master is running multiple applications. Each application stochastically generates real-time jobs with a strict…
An acceptable response time of a server is an important aspect in many client-server applications; this is evident in situations in which the server is overloaded by many computationally intensive requests. In this work, we consider that…
Many academic disciplines - including information systems, computer science, and operations management - face scheduling problems as important decision making tasks. Since many scheduling problems are NP-hard in the strong sense, there is a…
This paper deals with operational models for integrated shift and task scheduling problem. Staff scheduling problem is a special case of this with staff requirements as given input to the problem. Both problems become hard to solve when the…
We study the single machine scheduling problem with the objective to minimize the total weight of late jobs. It is assumed that the processing times of jobs are not exactly known at the time when a complete schedule must be dispatched.…
This paper presents two stochastic optimization approaches for simultaneous project scheduling and personnel planning, extending a deterministic model previously developed by Heimerl and Kolisch. For the problem of assigning work packages…
In a facility with front room and back room operations, it is useful to switch workers between the rooms in order to cope with changing customer demand. Assuming stochastic customer arrival and service times, we seek a policy for switching…
Healthcare systems are facing serious challenges in balancing their human resources to cope with volatile service demand, while at the same time providing necessary job satisfaction to the healthcare workers. We propose in this paper a…
In this paper, we consider the classic stochastic (dynamic) knapsack problem, a fundamental mathematical model in revenue management, with general time-varying random demand. Our main goal is to study the optimal policies, which can be…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
In this work, we study the single machine scheduling problem with uncertain release times and processing times of jobs. We adopt a robust scheduling approach, in which the measure of robustness to be minimized for a given sequence of jobs…
Recently, a variety of constraint programming and Boolean satisfiability approaches to scheduling problems have been introduced. They have in common the use of relatively simple propagation mechanisms and an adaptive way to focus on the…
This paper considers the scheduling of stochastic jobs on parallel identical machines to minimize the expected total weighted completion time. While this is a classical problem with a significant body of research on approximation algorithms…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…
This paper explores fast, polynomial time heuristic approximate solutions to the NP-hard problem of scheduling jobs on N identical machines. The jobs are independent and are allowed to be stopped and restarted on another machine at a later…