We consider the following general scheduling problem: The input consists of n jobs, each with an arbitrary release time, size, and a monotone function specifying the cost incurred when the job is completed at a particular time. The…
In the non-uniform sparsest cut problem, we are given a supply graph G and a demand graph D, both with the same set of nodes V. The goal is to find a cut of V that minimizes the ratio of the total capacity on the edges of G crossing the cut…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
We consider a single machine scheduling problem that seeks to minimize a generalized cost function: given a subset of jobs we must order them so as to minimize $\sum f_j(C_j)$, where $C_j$ is the completion time of job $j$ and $f_j$ is a…
In this paper, we will find a pseudopolynomial algorithm to solve $Qm \mid \mid L_{\max}$ and then we will prove that it is impossible to get any constant-factor approximation in polynomial time, and thus also impossible to have a PTAS for…
We consider the problem of makespan minimization on unrelated machines when job sizes are stochastic. The goal is to find a fixed assignment of jobs to machines, to minimize the expected value of the maximum load over all the machines. For…
This paper is concerned with the $1||\sum p_jU_j$ problem, the problem of minimizing the total processing time of tardy jobs on a single machine. This is not only a fundamental scheduling problem, but also a very important problem from a…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
We study the precedence-constrained resource scheduling problem [SICOMP'75]. There are $n$ jobs where each job takes a certain time to finish and has a resource requirement throughout the execution time. There are precedence among the jobs.…
We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
We propose constant approximation algorithms for generalizations of the Flexible Flow Shop (FFS) problem which form a realistic model for non-preemptive scheduling in MapReduce systems. Our results concern the minimization of the total…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
In Polyamorous Scheduling, we are given an edge-weighted graph and must find a periodic schedule of matchings in this graph which minimizes the maximal weighted waiting time between consecutive occurrences of the same edge. This NP-hard…
We consider the problem of scheduling $n$ jobs on $m$ uniform machines while minimizing the makespan ($Q||C_{\max}$) and maximizing the minimum completion time ($Q||C_{\min}$) in an online setting with migration of jobs. In this online…
We consider the problem of finding patrol schedules for $k$ robots to visit a given set of $n$ sites in a metric space. Each robot has the same maximum speed and the goal is to minimize the weighted maximum latency of any site, where the…
The ever increasing adoption of mobile devices with limited energy storage capacity, on the one hand, and more awareness of the environmental impact of massive data centres and server pools, on the other hand, have both led to an increased…
This paper presents a novel idea for the general case of the Common Due-Date (CDD) scheduling problem. The problem is about scheduling a certain number of jobs on a single or parallel machines where all the jobs possess different processing…