Related papers: Approximating the $2$-Machine Flow Shop Problem wi…
We consider some flow-time minimization problems in the unrelated machines setting. In this setting, there is a set of $m$ machines and a set of $n$ jobs, and each job $j$ has a machine dependent processing time of $p_{ij}$ on machine $i$.…
We study the consensus-halving problem of dividing an object into two portions, such that each of $n$ agents has equal valuation for the two portions. The $\epsilon$-approximate consensus-halving problem allows each agent to have an…
A bicriteria approximation algorithm is presented for the unrooted traveling repairman problem, realizing increased profit in return for increased speedup of repairman motion. The algorithm generalizes previous results from the case in…
Order picking is the problem of collecting a set of products in a warehouse in a minimum amount of time. It is currently a major bottleneck in supply-chain because of its cost in time and labor force. This article presents two exact and…
We provide approximation algorithms for two problems, known as NECKLACE SPLITTING and $\epsilon$-CONSENSUS SPLITTING. In the problem $\epsilon$-CONSENSUS SPLITTING, there are $n$ non-atomic probability measures on the interval $[0, 1]$ and…
This report presents a low computational and cognitive complexity, stable, time accurate and adaptive method for the Navier-Stokes equations. The improved method requires a minimally intrusive modification to an existing program based on…
This paper addresses the challenging scheduling problem of coflows with release times, with the objective of minimizing the total weighted completion time. Previous literature has predominantly concentrated on establishing the scheduling…
With the rapid advancement of technology, parallel computing applications have become increasingly popular and are commonly executed in large data centers. These applications involve two phases: computation and communication, which are…
We consider the classic problem of scheduling jobs with precedence constraints on a set of identical machines to minimize the makespan objective function. Understanding the exact approximability of the problem when the number of machines is…
In the bottleneck multiple knapsack problem, we are given a set of items and a set of knapsacks, where each item has a profit and a weight, and each knapsack has a capacity. Our goal is to assign items to knapsacks so as to maximize the…
Flowshop problems play a prominent role in operations research, and have considerable practical significance. The single-machine flowshop problem is of particular theoretical interest. Until now the problem of minimizing late jobs or job…
We study the computational complexity of scheduling jobs on a single speed-scalable processor with the objective of capturing the trade-off between the (weighted) flow time and the energy consumption. This trade-off has been extensively…
In nearly every discipline, scientific computations are limited by the cost and speed of computation. For example, the best-known exact algorithms for the canonical Traveling Salesman Problem would take centuries to run on an instance of…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…
We consider the problem of online scheduling on a single machine in order to minimize weighted flow time. The existing algorithms for this problem (STOC '01, SODA '03, FOCS '18) all require exact knowledge of the processing time of each…
This paper studies scheduling coupled tasks with exact delays to minimize maximum lateness. The first task has processing time $p>0$ and the second $b_i\geq 0$, also the second needs to start exactly $p$ units of time after the completion…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
The Workflow Satisfiability Problem (WSP) asks whether there exists an assignment of authorized users to the steps in a workflow specification, subject to certain constraints on the assignment. The problem is NP-hard even when restricted to…
The non-preemptive job scheduling problem with release times and deadlines on a single machine is fundamental to many scheduling problems. We parameterize this problem by the set of job lengths the jobs can have. The case where all job…