The minimization of makespan in open shop with time lags has been shown NP-hard in the strong sense even for the case of two machines and unit-time operations. The minimization of total completion time however has remained open for that…
We consider a recently introduced fair repetitive scheduling problem involving a set of clients, each asking for their associated job to be daily scheduled on a single machine across a finite planning horizon. The goal is to determine a job…
In this paper we study the classical no-wait flowshop scheduling problem with makespan objective (F|no-wait|C_max in the standard three-field notation). This problem is well-known to be a special case of the asymmetric traveling salesman…
We consider the Demand Strip Packing problem (DSP), in which we are given a set of jobs, each specified by a processing time and a demand. The task is to schedule all jobs such that they are finished before some deadline $D$ while…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
This paper addresses the scheduling problem of coflows in identical parallel networks, which is a well-known $NP$-hard problem. Coflow is a relatively new network abstraction used to characterize communication patterns in data centers. We…
We study the Parallel Task Scheduling problem $Pm|size_j|C_{\max}$ with a constant number of machines. This problem is known to be strongly NP-complete for each $m \geq 5$, while it is solvable in pseudo-polynomial time for each $m \leq 3$.…
Scheduling a set of jobs over a collection of machines is a fundamental problem that needs to be solved millions of times a day in various computing platforms: in operating systems, in large data clusters, and in data centers. Along with…
Routing and scheduling problems are fundamental problems in combinatorial optimization, and also have many applications. Most variations of these problems are NP-Hard, so we need to use heuristics to solve these problems on large instances,…
Since its development in the early 90's, parameterized complexity has been widely used to analyze the tractability of many NP-hard combinatorial optimization problems with respect to various types of problem parameters. While the generic…
In the Demand Strip Packing problem (DSP), we are given a time interval and a collection of tasks, each characterized by a processing time and a demand for a given resource (such as electricity, computational power, etc.). A feasible…
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
We study a delay-sensitive information flow problem where a source streams information to a sink over a directed graph G(V,E) at a fixed rate R possibly using multiple paths to minimize the maximum end-to-end delay, denoted as the…
In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the…
Flow shops are widely studied machine environments in which all jobs must visit all machines in the same order. While conventional flow shops assume that each job traverses the shop only once, many industrial environments require jobs to…
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…
The Jobs shop Scheduling Problem (JSP) is a canonical combinatorial optimization problem that is routinely solved for a variety of industrial purposes. It models the optimal scheduling of multiple sequences of tasks, each under a fixed…
In the Equal Maximum Flow Problem (EMFP), we aim for a maximum flow where we require the same flow value on all edges in some given subsets of the edge set. In this paper, we study the closely related Almost Equal Maximum Flow Problems…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…