Related papers: Non-Clairvoyant Scheduling to Minimize Max Flow Ti…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
In a scheduling game, each player owns a job and chooses a machine to execute it. While the social cost is the maximal load over all machines (makespan), the cost (disutility) of each player is the completion time of its own job. In the…
Modern computing workloads are often composed of parallelizable jobs. A parallelizable job can be completed more quickly when run on additional servers. However, each job can only use a limited number of servers, known as its…
We study single-machine scheduling of jobs, each belonging to a job type that determines its duration distribution. We start by analyzing the scenario where the type characteristics are known and then move to two learning scenarios where…
With the ever-growing need of data in HPC applications, the congestion at the I/O level becomes critical in super-computers. Architectural enhancement such as burst-buffers and pre-fetching are added to machines, but are not sufficient to…
We consider the coflow scheduling problem in the non-clairvoyant setting, assuming that flow sizes are realized on-line according to given probability distributions. The goal is to minimize the weighted average completion time of coflows in…
This paper considers using predictions in the context of the online Joint Replenishment Problem with Deadlines (JRP-D). Prior work includes asymptotically optimal competitive ratios of $O(1)$ for the clairvoyant setting and $O(\sqrt{n})$ of…
This paper investigates the non-clairvoyant parallel machine scheduling problem with prediction, with the objective of minimizing the makespan. Improved lower bounds for the problem and competitive ratios of online algorithms with respect…
We introduce a novel adversarial model for scheduling with explorable uncertainty. In this model, the processing time of a job can potentially be reduced (by an a priori unknown amount) by testing the job. Testing a job $j$ takes one unit…
This paper studies the scheduling of jobs of different families on parallel machines with qualification constraints. Originating from semiconductor manufacturing, this constraint imposes a time threshold between the execution of two jobs of…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
We consider the problem of online job scheduling on a single machine or multiple unrelated machines with general job/machine-dependent cost functions. In this model, each job $j$ has a processing requirement (length) $v_{ij}$ and arrives…
We consider the classic problem of scheduling jobs with precedence constraints on a set of identical machines to minimize the makespan objective function. Understanding the exact approximability of the problem when the number of machines is…
We consider the pull-based broadcast scheduling model. In this model, there are n unit-sized pages of information available at the server. Requests arrive over time at the server asking for a specific page. When the server transmits a page,…
Interval scheduling is a basic problem in the theory of algorithms and a classical task in combinatorial optimization. We develop a set of techniques for partitioning and grouping jobs based on their starting and ending times, that enable…
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…
We consider the classical scheduling problem on a single machine, on which we need to schedule sequentially $n$ given jobs. Every job $j$ has a processing time $p_j$ and a priority weight $w_j$, and for a given schedule a completion time…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard…
Speed-robust scheduling is the following two-stage problem of scheduling $n$ jobs on $m$ uniformly related machines. In the first stage, the algorithm receives the value of $m$ and the processing times of $n$ jobs; it has to partition the…
A new class of multi agent single machine scheduling problems is introduced, where each job is associated with a self interested agent with a utility function decreasing in completion time. We aim to achieve a fair solution by maximizing…