Related papers: Fermilab Cryomodule Test Stand RF Interlock System
This paper describes the cryogenic system for the Cryomodule Test Stand (CMTS) at the new Cryomodule Test Facility (CMTF) located at Fermilab. CMTS is designed for production testing of the 1.3 GHz and 3.9 GHz cryomodules to be used in the…
In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These devices will be…
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3…
In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These include a prototype…
The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to…
The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as…
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and…
PIP-II is a superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an RFQ and buncher cavities along with 25 superconducting cryo-modules…
Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the full cryomodule have been performed. We report on the…
PIP-II is an 800 MEV superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an ion source, RFQ and buncher cavities along with 25 superconducting…
The Linac Coherent Light Source (LCLS) at Stanford Linear Accelerator Center (SLAC) is in the process of being upgraded to a superconducting radio frequency (SRF) accelerator and renamed LCLS-II. This upgrade requires thirty five 1.3 GHz…
Fermilab recently completed production and testing of 1.3 GHz cryomodules for the LCLS-II project. Each cryomodule consists of eight TESLA-shaped superconducting elliptical cavities equipped with two High Order Mode (HOM) coupler ports.…
Fermi National Accelerator Laboratory is constructing a superconducting 1.3 GHz cryomodule test facility located at the New Muon Lab building. The facility will be used for testing and validating cryomodule designs as well as support…
Commissioning and operation of the first Tesla-style Cryomodule (CM-1) at Fermilab was concluded in recent months. A second Tesla Type III+ module, RFCA002, will be replacing it. CM-1 is the first 8-cavity ILC style cryomodule to be built…
As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and…
The LCLS-II HE superconducting linac can produce multi-energy beams by supporting multiple undulator lines simultaneously. This could be achieved by using the cavity SRF tuner in the off-frequency detune mode. This off-frequency operation…
Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules.…
CEA IRFU Saclay is taking part of ESS (European Spallation Source) construction through several packages and, especially in the last three years on the Elliptical Cavity and Cryomodule Test stand Demonstrator (ECCTD). The project consists…
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam…
The first cryomodule for the beam test facility at the Fermilab New-Muon-Lab building is currently under RF commissioning. Among other diagnostics systems, the transverse position of the helium gas return pipe with the connected 1.3 GHz SRF…