In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These include a prototype…
This paper describes the cryogenic system for the Cryomodule Test Stand (CMTS) at the new Cryomodule Test Facility (CMTF) located at Fermilab. CMTS is designed for production testing of the 1.3 GHz and 3.9 GHz cryomodules to be used in the…
The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to…
An interlock system has been designed for the Fermilab Cryo-module Test Stand (CMTS), a test bed for the cryomodules to be used in the upcoming Linac Coherent Light Source 2 (LCLS-II) project at SLAC. The interlock system features 8…
Quality factor is a primary cost driver for high energy, continuous wave (CW) SRF linacs like the LCLS-II X-ray free electron laser currently under construction. Taking this into account, several innovations were introduced in the LCLS-II…
The superconducting RF linac for LCLS-II calls for 1.3 GHz 9-cell cavities with an average intrinsic quality factor Q0 of 2.7x10^10 at 2 K and 16 MV/m accelerating gradient. Two niobium 9-cell cavities, prepared with nitrogen-doping at…
A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3…
An 8-cavity, 1.3 GHz, LCLS-II-HE cryomodule was assembled and tested at Fermilab to verify performance before the start of production. Its cavities were processed with a novel nitrogen doping treatment to improve gradient performance. The…
A Buncher or Capture Cavity (BCC) Cryomodule is currently in development at Fermilab for use in a second injector for LCLS-II-HE. The BCC Cryomodule is designed to contain one 1.3 GHz cavity and one solenoid magnet as part of a 100MeV low…
Fermilab recently completed production and testing of 1.3 GHz cryomodules for the LCLS-II project. Each cryomodule consists of eight TESLA-shaped superconducting elliptical cavities equipped with two High Order Mode (HOM) coupler ports.…
The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as…
Commissioning and operation of the first Tesla-style Cryomodule (CM-1) at Fermilab was concluded in recent months. A second Tesla Type III+ module, RFCA002, will be replacing it. CM-1 is the first 8-cavity ILC style cryomodule to be built…
Fermi National Accelerator Laboratory is constructing a superconducting 1.3 GHz cryomodule test facility located at the New Muon Lab building. The facility will be used for testing and validating cryomodule designs as well as support…
The Linac Coherent Light Source (LCLS) at Stanford Linear Accelerator Center (SLAC) is in the process of being upgraded to a superconducting radio frequency (SRF) accelerator and renamed LCLS-II. This upgrade requires thirty five 1.3 GHz…
Microphonics causes the cavity to detune. This study discusses the microphonics of sixteen 1.3 GHz cryomodules, 14 for LCLS-II and 2 for LCLS-II HE tested at CMTF. The peak detuning, as well as the RMS detuning for each cryomodule, will be…
This note presents measurements that support the conclusion that it is feasible to achieve magnetic field values at the level of 5 milliGauss for a cryomodule in a realistic and representative ambient magnetic field environment.
Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the initial phase of the facility consists of two Tevatron style…
The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five…
When a superconducting radiofrequency cavity is cooled through its critical temperature, ambient magnetic flux can become "frozen in" to the superconductor, resulting in degradation of the quality factor. This is especially problematic in…
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and…