The two-dimensional non-oriented bin packing problem with due dates packs a set of rectangular items, which may be rotated by 90 degrees, into identical rectangular bins. The bins have equal processing times. An item's lateness is the…
This paper addresses the two-dimensional bin packing problem with guillotine constraints. The problem requires a set of rectangular items to be cut from larger rectangles, known as bins, while only making use of edge-to-edge (guillotine)…
Cutting and packing problems are present in many, at first glance unconnected, areas, therefore it's beneficial to have a good understanding of their underlying structure, to select proper techniques for finding solutions. Cutting and…
Warehouses are nowadays the scene of complex logistic problems integrating different decision layers. This paper addresses the Joint Order Batching, Picker Routing and Sequencing Problem with Deadlines (JOBPRSP-D) in rectangular warehouses.…
We study the scheduling of jobs on a single parallel-batching machine with non-identical job sizes and incompatible job families. Jobs from the same family have the same processing time and can be loaded into a batch, as long as the batch…
Two-dimensional bin packing problems are highly relevant combinatorial optimization problems. They find a large number of applications, for example, in the context of transportation or warehousing, and for the cutting of different materials…
Paper cutting is a simple process of slicing large rolls of paper, jumbo-reels, into various sub-rolls with variable widths based on demands risen by customers. Since the variability is high due to collected various orders into a pool, the…
The article proposes a heuristic approximation approach to the bin packing problem under multiple objectives. In addition to the traditional objective of minimizing the number of bins, the heterogeneousness of the elements in each bin is…
Bin packing problem examines the minimum number of identical bins needed to pack a set of items of various weights. This problem arises in various areas of the artificial intelligence demanding derivation of the exact solutions in the…
In this study, we examine a two-dimensional bin-packing problem in printed circuit board manufacturing. Among other objectives, the number of bins, but also the number of different bin layouts, is to be minimized. As the running times of an…
This paper examines scheduling problem denoted as $P|seq, ser|C_{max}$ in Graham's notation; in other words, scheduling of tasks on parallel identical machines ($P$) with sequence-dependent setups ($seq$) each performed by one of the…
We address the bin packing problem (BPP), which aims to maximize bin utilization when packing a variety of items. The offline problem, where the complete information about the item set and their sizes is known in advance, is proven to be…
This work deals with a class of problems under interval data uncertainty, namely interval robust-hard problems, composed of interval data min-max regret generalizations of classical NP-hard combinatorial problems modeled as 0-1 integer…
Recently, the makespan-minimization problem of compiling a general class of quantum algorithms into near-term quantum processors has been introduced to the AI community. The research demonstrated that temporal planning is a strong approach…
In this paper we introduce a new problem in the field of production planning which we call the Production Leveling Problem. The task is to assign orders to production periods such that the load in each period and on each production resource…
This research investigates a multi-product capacitated lot-sizing and scheduling problem incorporating a novel learning effect, namely the period-based learning effect. This is inspired by a real case in a core analysis laboratory under a…
We present a heuristic algorithm for solving the problem of scheduling plans of tasks. The plans are ordered vectors of tasks, and tasks are basic operations carried out by resources. Plans are tied by temporal, precedence and resource…
Constraint Programming (CP) is a declarative programming paradigm that allows for modeling and solving combinatorial optimization problems, such as the Job-Shop Scheduling Problem (JSSP). While CP solvers manage to find optimal or…
Motivated by a transit line planning problem in transportation systems, we investigate the following capacitated assignment problem under a budget constraint. Our model involves $L$ bins and $P$ items. Each bin $l$ has a utilization cost…
This study introduces the Box Allocation Problem (BAP), a novel optimization challenge in the $1.4 billion UK meal kit delivery market. BAP involves assigning orders across multiple production facilities to minimize daily recipe variations…