Related papers: Structural Parameters for Scheduling with Assignme…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…
The (Non-Preemptive) Throughput Maximization problem is a natural and fundamental scheduling problem. We are given $n$ jobs, where each job $j$ is characterized by a processing time and a time window, contained in a global interval $[0,T)$,…
We consider several combinatorial optimization problems which combine the classic shop scheduling problems, namely open shop scheduling or job shop scheduling, and the shortest path problem. The objective of the obtained problem is to…
The Map-Reduce computing framework rose to prominence with datasets of such size that dozens of machines on a single cluster were needed for individual jobs. As datasets approach the exabyte scale, a single job may need distributed…
A mixed shop is a manufacturing infrastructure designed to process a mixture of a set of flow-shop jobs and a set of open-shop jobs. Mixed shops are in general much more complex to schedule than flow-shops and open-shops, and have been…
We consider non-preemptive scheduling of MapReduce jobs with multiple tasks in the practical scenario where each job requires several map-reduce rounds. We seek to minimize the average weighted completion time and consider scheduling on…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…
This paper studies a single-machine scheduling problem with a non-renewable resource (NR-SSP) and total weighted completion time criterion. The non-renewable resource is consumed when the machine starts processing a job. We consider the…
We consider the well-studied problem of finding a spanning tree with minimum average distance between vertex pairs (called a MAD tree). This is a classic network design problem which is known to be NP-hard. While approximation algorithms…
Makespan minimization in restricted assignment $(R|p_{ij}\in \{p_j, \infty\}|C_{\max})$ is a classical problem in the field of machine scheduling. In a landmark paper in 1990 [8], Lenstra, Shmoys, and Tardos gave a 2-approximation algorithm…
We study a natural variant of scheduling that we call \emph{partial scheduling}: In this variant an instance of a scheduling problem along with an integer $k$ is given and one seeks an optimal schedule where not all, but only $k$ jobs, have…
We consider the classical scheduling problem on parallel identical machines to minimize the makespan, and achieve the following results under the Exponential Time Hypothesis (ETH) 1. The scheduling problem on a constant number $m$ of…
Since the publication of the first scheduling paper in 1954, a huge number of works dealing with different types of single machine problems appeared. They addressed many heuristics and enumerative procedures, complexity results or…
We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show…
The Traveling Salesman Problem (TSP) is a classic and extensively studied problem with numerous real-world applications in artificial intelligence and operations research. It is well-known that TSP admits a constant approximation ratio on…
Many problems are NP-hard and, unless P = NP, do not admit polynomial-time exact algorithms. The fastest known exact algorithms exactly usually take time exponential in the input size. Much research effort has gone into obtaining faster…
Parallel parameterized complexity theory studies how fixed-parameter tractable (fpt) problems can be solved in parallel. Previous theoretical work focused on parallel algorithms that are very fast in principle, but did not take into account…
The problem of attaining energy efficiency in distributed systems is of importance, but a general, non-domain-specific theory of energy-minimal scheduling is far from developed. In this paper, we classify the problems of energy-minimal…
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…