Related papers: Installation Progress At The PIP-II Injector Test …
The PIP2IT accelerator was assembled in multiple stages in 2014 - 2021 to test concepts and components of the future PIP-II linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA…
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three…
The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam…
Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its…
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments.…
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary…
Front end of a CW linac of the Project X contains an H source, an RFQ, a medium energy transport line with the beam chopper, and a SC low-beta linac that accelerates H- from 2.5 MeV to 160 MeV. SC Single Spoke Resonators (SSR) will be used…
The Proton Improvement Plan II (PIPII) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beams for neutrino production. The Linac requires cooling at 80 K, 5 K, and 2 K temperatures, which will…
A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration…
The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC…
A 52MHz Radio Frequency Quadrupole (RFQ) linear accelerator (linac) is designed to serve as an initial structure for the SSC-linac system (injector into Separated Sector Cyclotron). The designed injection and output energy are 3.5 keV/u and…
Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector…
Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the…
This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development…
As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and…
The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the…
The Fermi National Accelerator Laboratory (FNAL) Linac has been in operation for 52 years. In approximately four years, it will be replaced by a new 800 MeV superconducting machine, the PIP-II SRF Linac. In the current configuration, the…
The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam…
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the…
"LUE200" - 200 MeV electron linac is being created at JINR as a driver of the pulsed neutron source "IREN" [1]. The special full-scale facilities for testing the main systems of LUE-200 (FSTF) are used at JINR, BINP, MEPhI and YerPhI [2].…