This paper presents a hierarchical framework to solve the multi-robot temporal task planning problem. We assume that each robot has its individual task specification and the robots have to jointly satisfy a global collaborative task…
In this paper we study the classical scheduling problem of minimizing the total weighted completion time on a single machine with the constraint that one specific job must be scheduled at a specified position. We give dynamic programs with…
Embedded hard real time systems require substantial amount of emergency processing power for the management of large scale systems like a nuclear power plant under the threat of an earth quake or a future transport systems under a peril. In…
The performance, reliability, cost, size and energy usage of computing systems can be improved by one or more orders of magnitude by the systematic use of modern control and optimization methods. Computing systems rely on the use of…
The problem of scheduling with testing in the framework of explorable uncertainty models environments where some preliminary action can influence the duration of a task. In the model, each job has an unknown processing time that can be…
A queue is required when a service provider is not able to handle jobs arriving over the time. In a highly flexible and dynamic environment, some jobs might demand for faster execution at run-time especially when the resources are limited…
This paper considers scheduling on identical machines. The scheduling objective considered in this paper generalizes most scheduling minimization problems. In the problem, there are $n$ jobs and each job $j$ is associated with a…
We consider the online busy time scheduling problem motivated by energy and cost minimization in cloud computing systems. The input is a set of jobs $J=\{1,\dots,n\}$ where each job $j\in J$ has a release time $r_j$, deadline $d_j$, and…
We study the problem of scheduling jobs on fault-prone machines communicating via a shared channel, also known as multiple-access channel. We have $n$ arbitrary length jobs to be scheduled on $m$ identical machines, $f$ of which are prone…
In this paper, we consider the robot motion (or task) planning problem under some given time bounded high level specifications. We use metric interval temporal logic (MITL), a member of the temporal logic family, to represent the task…
We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal…
We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation…
We consider the problem of efficiently scheduling jobs with precedence constraints on a set of identical machines in the presence of a uniform communication delay. Such precedence-constrained jobs can be modeled as a directed acyclic graph,…
In this paper, we address the scheduling problem of multi-mode real-time systems upon uniform multiprocessor platforms. We propose two transition protocols, specified together with their schedulability test, and provide the reader with two…
Motion planning of an autonomous system with high-level specifications has wide applications. However, research of formal languages involving timed temporal logic is still under investigation. Furthermore, many existing results rely on a…
We consider online scheduling to minimize weighted completion time on related machines, where each job consists of several tasks that can be concurrently executed. A job gets completed when all its component tasks finish. We obtain an…
We investigate deterministic non-preemptive online scheduling with delayed commitment for total completion time minimization on parallel identical machines. In this problem, jobs arrive one-by-one and their processing times are revealed…
For scheduling in flexible manufacturing system (FMS), many factors should be considered, it is difficult to solve the scheduling problem by satisfying different criteria (production cost, utilization of system, number of movements of part,…
Many complex activities of production cycles, such as quality control or fault analysis, require highly experienced specialists to perform various operations on (semi)finished products using different tools. In practical scenarios, the…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…