Related papers: Closing the Gap for Makespan Scheduling via Sparsi…
We give new sublinear and parallel algorithms for the extensively studied problem of approximating n-variable r-CSPs (constraint satisfaction problems with constraints of arity r up to an additive error. The running time of our algorithms…
As the gap between compute and I/O performance tends to grow, modern High-Performance Computing (HPC) architectures include a new resource type: an intermediate persistent fast memory layer, called burst buffers. This is just one of many…
Makespan minimization on unrelated machines is a classic problem in approximation algorithms. No polynomial time $(2-\delta)$-approximation algorithm is known for the problem for constant $\delta> 0$. This is true even for certain special…
We study ordinal makespan scheduling on small numbers of identical machines, with respect to two parallel solutions. In ordinal scheduling, it is known that jobs are sorted by non-increasing sizes, but the specific sizes are not known in…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…
We study stochastic combinatorial optimization problems where the objective is to minimize the expected maximum load (a.k.a.\ the makespan). In this framework, we have a set of $n$ tasks and $m$ resources, where each task $j$ uses some…
This paper considers the scheduling of stochastic jobs on parallel identical machines to minimize the expected total weighted completion time. While this is a classical problem with a significant body of research on approximation algorithms…
Coflow is a prominent network abstraction for modeling communication patterns in data centers. Since coflow scheduling in large-scale data centers is $\mathcal{NP}$-hard, this paper investigates this problem within heterogeneous parallel…
Knapsack is one of the most fundamental problems in theoretical computer science. In the $(1 - \epsilon)$-approximation setting, although there is a fine-grained lower bound of $(n + 1 / \epsilon) ^ {2 - o(1)}$ based on the $(\min,…
We consider the classical problem of scheduling $n$ jobs with release dates on both single and identical parallel machines. We measure the quality of service provided to each job by its stretch, which is defined as the ratio of its response…
Consider the Maximum Weight Independent Set problem for rectangles: given a family of weighted axis-parallel rectangles in the plane, find a maximum-weight subset of non-overlapping rectangles. The problem is notoriously hard both in the…
Makespan minimization (on parallel identical or unrelated machines) is arguably the most natural and studied scheduling problem. A common approach in practical algorithm design is to reduce the size of a given instance by a fast…
A recent work by [Larsen, SODA 2023] introduced a faster combinatorial alternative to Bansal's SDP algorithm for finding a coloring $x \in \{-1, 1\}^n$ that approximately minimizes the discrepancy $\mathrm{disc}(A, x) := | A x |_{\infty}$…
We consider the problem of efficiently scheduling jobs with precedence constraints on a set of identical machines in the presence of a uniform communication delay. Such precedence-constrained jobs can be modeled as a directed acyclic graph,…
In the Maximum Independent Set of Objects problem, we are given an $n$-vertex planar graph $G$ and a family $\mathcal{D}$ of $N$ objects, where each object is a connected subgraph of $G$. The task is to find a subfamily $\mathcal{F}…
We consider the problem of scheduling $n$ jobs to minimize the makespan on $m$ unrelated machines, where job $j$ requires time $p_{ij}$ if processed on machine $i$. A classic algorithm of Lenstra et al. yields the best known approximation…
Distributed computing systems often need to consider the scheduling problem involving a collection of highly dependent data-processing tasks that must work in concert to achieve mission-critical objectives. This paper considers the…
In the Hedge Cut problem, the edges of a graph are partitioned into groups called hedges, and the question is what is the minimum number of hedges to delete to disconnect the graph. Ghaffari, Karger, and Panigrahi [SODA 2017] showed that…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
While previous work on energy-efficient algorithms focused on assumption that tasks can be assigned to any processor, we initially study the problem of task scheduling on restricted parallel processors. The objective is to minimize the…