Related papers: A 2.542-Approximation for Precedence Constrained S…
Budget Minimization is a scheduling problem with precedence constraints, i.e., a scheduling problem on a partially ordered set of jobs $(N, \unlhd)$. A job $j \in N$ is available for scheduling, if all jobs $i \in N$ with $i \unlhd j$ are…
The considered problem is how to optimally allocate a set of jobs to technicians of different skills such that the number of technicians of each skill does not exceed the number of persons with that skill designation. The key motivation is…
We study the problem of scheduling VMs (Virtual Machines) in a distributed server platform, motivated by cloud computing applications. The VMs arrive dynamically over time to the system, and require a certain amount of resources (e.g.…
In end-to-end distributed real time systems, a task may be executed sequentially on different processors. The end-toend task response time must not exceed the end-to-end task deadline to consider the task a schedulable task. In transient…
We revisit the non-preemptive speed-scaling problem, in which a set of jobs have to be executed on a single or a set of parallel speed-scalable processor(s) between their release dates and deadlines so that the energy consumption to be…
We consider the problem of scheduling a set of jobs on a set of identical parallel machines, with the aim of minimizing the total weighted completion time. The problem has been solved in the literature with a number of mathematical…
A central problem in scheduling is to schedule $n$ unit size jobs with precedence constraints on $m$ identical machines so as to minimize the makespan. For $m=3$, it is not even known if the problem is NP-hard and this is one of the last…
In this work, we study the computational (parameterized) complexity of $P \mid r_j, p_j=p \mid \sum_j w_j U_j$. Here, we are given $m$ identical parallel machines and $n$ jobs with equal processing time, each characterized by a release…
We investigate the recoverable robust single machine scheduling problem under interval uncertainty. In this setting, jobs have first-stage processing times p and second-stage processing times q and we aim to find a first-stage and…
This paper considers a recoverable robust single-machine scheduling problem under polyhedral uncertainty with the objective of minimising the total flow time. In this setting, a decision-maker must determine a first-stage schedule subject…
In this paper a class of single machine scheduling problems is considered. It is assumed that job processing times and due dates can be uncertain and they are specified in the form of discrete scenario set. A probability distribution in the…
This paper studies the online scheduling problem of minimizing total flow time for $n$ jobs on $m$ identical machines. A classical $\Omega(n)$ lower bound shows that no deterministic single-machine algorithm can beat the trivial greedy,…
The paper presents complexity results and performance guaranties for a family of approximation algorithms for an optimisation problem arising in software testing and manufacturing. The problem is formulated as a partitioning of a set where…
In this work, we study the trade-off between the running time of approximation algorithms and their approximation guarantees. By leveraging a structure of the `hard' instances of the Arora-Rao-Vazirani lemma [JACM'09], we show that the…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
In classical scheduling problems, we are given jobs and machines, and have to schedule all the jobs to minimize some objective function. What if each job has a specified profit, and we are no longer required to process all jobs -- we can…
We study the online preemptive scheduling of intervals and jobs (with restarts). Each interval or job has an arrival time, a deadline, a length and a weight. The objective is to maximize the total weight of completed intervals or jobs.…
In Polyamorous Scheduling, we are given an edge-weighted graph and must find a periodic schedule of matchings in this graph which minimizes the maximal weighted waiting time between consecutive occurrences of the same edge. This NP-hard…
In this paper, we consider the online version of the machine minimization problem (introduced by Chuzhoy et al., FOCS 2004), where the goal is to schedule a set of jobs with release times, deadlines, and processing lengths on a minimum…
This paper focuses on the problem of coflow scheduling with precedence constraints in identical parallel networks, which is a well-known $\mathcal{NP}$-hard problem. Coflow is a relatively new network abstraction used to characterize…