Related papers: Performance of the Cathode Strip Chamber endcap mu…
The muon system of the CMS experiment is expected to upgrade all of its subdetectors for the Phase-2 of the Large Hadron Collider (LHC) that will begin in 2029. The upgrade plans for drift tubes (DTs), cathode strip chambers (CSCs) and…
The Cathode Strip Chambers (CSCs) constitute the primary muon tracking device in the CMS endcaps. Their performance has been evaluated using data taken during a cosmic ray run in fall 2008. Measured noise levels are low, with the number of…
The high pseudo-rapidity region of the CMS muon system is covered by Cathode Strip Chambers (CSC) only and lacks redundant coverage despite the fact that it is a challenging region for muons in terms of backgrounds and momentum resolution.…
The CMS experiment at the LHC has started data taking in Run 3 at a $\mathrm{pp}$ collision energy of $13.6~\mathrm{TeV}$. In preparation for Run 3, detector systems, such as Pixel Tracker, HCAL and CSC, have been upgraded due to…
The CMS experiment, located at the CERN Large Hadron Collider, has a redundant muon system composed by three different detector technologies: Cathode Strip Chambers (in the forward regions), Drift Tubes (in the central region) and Resistive…
The muon spectrometer of the CMS (Compact Muon Solenoid) experiment at the Large Hadron Collider (LHC) is equipped with a redundant system made of Resistive Plate Chambers and Drift Tube in barrel and RPC and Cathode Strip Chamber in endcap…
During Phase-2 of the LHC, known as the High Luminosity LHC (HL-LHC), the accelerator will increase its instantaneous luminosity to 5 $\times$ 10$^{34}$ cm$^{-2}$ s$^{-1}$, delivering an integrated luminosity of 3000 fb$^{-1}$ over 10 years…
The CMS experiment, located at the Large Hadron Collider (LHC) in CERN, has a redundant muon system composed by three different gaseous detector technologies: Cathode Strip Chambers (in the forward regions), Drift Tubes (in the central…
As part of the Compact Muon Solenoid experiment Phase-II upgrade program, new Resistive Plate Chambers will be installed in the forward region. High background conditions are expected in this region during the high-luminosity phase of the…
The CMS muon system has played a key role for many physics results obtained from the LHC Run-1 data. During the Long Shutdown (2013-2014) significant upgrades have been carried out on the muon detectors and on the L1 muon trigger. In…
Since the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which…
The muon spectrometer of the CMS (Compact Muon Solenoid) experiment at the Large Hadron Collider (LHC) is equipped with a redundant system made of Resistive Plate Chambers (RPCs) and Drift Tube (DT) chambers in the barrel, RPC and Cathode…
The Muon Upgrade Phase II of the Compact Muon Solenoid (CMS) aims to guarantee the optimal conditions of the present system and extend the $\eta$ coverage to ensure a reliable system for the High Luminosity Large Hadron Collider (HL-LHC)…
The CMS muon system includes in both the barrel and endcap region Resistive Plate Chambers (RPC). They mainly serve as trigger detectors and also improve the reconstruction of muon parameters. Over the years, the instantaneous luminosity of…
In Run 3 of the LHC, the instantaneous luminosity at the LHCb interaction point has been increased by a factor of five, from $4\times 10^{32}\rm{cm}^{-2}\rm{s}^{-1}$ to $2\times 10^{33}\rm{cm}^{-2}\rm{s}^{-1}$. Several hardware…
With the increases in the LHC instantaneous luminosity, maintaining effective triggering and avoiding dead time will become especially challenging. As the sensitivity of many physics studies, depends critically on the ability to maintain…
The Resistive Plate Chambers detector system at the CMS experiment at the LHC provides robustness and redundancy to the muon trigger. A total of 1056 double-gap chambers cover the pseudo-rapidity region < 1.6. The main detector parameters…
The CMS muon system operates gas-based detectors. Upgrades of the detectors and trigger components are needed to cope with increasingly challenging conditions of the HL-LHC. New irradiation tests are performed to ensure that the muon…
The high pseudorapidity ($\eta$) region of the Compact Muon Solenoid (CMS) muon system is covered by Cathode Strip Chambers only and lacks redundant coverage despite the fact that it is a challenging region for muons in terms of backgrounds…
The CMS muon system is undergoing substantial upgrades to meet the challenges of the High-Luminosity LHC (HL-LHC), including the installation of the new Muon Endcap 0 (ME0) detector. Large-scale production started in 2024. ME0 is a…