Related papers: A (1+epsilon)-Approximation for Makespan Schedulin…
We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related…
We study the efficient approximability of basic graph and logic problems in the literature when instances are specified hierarchically as in \cite{Le89} or are specified by 1-dimensional finite narrow periodic specifications as in…
We give a polynomial time, $(1+\epsilon)$-approximation algorithm for the traveling repairman problem (TRP) in the Euclidean plane and on weighted trees. This improves on the known quasi-polynomial time approximation schemes for these…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
Given a complete graph $G = (V, E)$ where each edge is labeled $+$ or $-$, the Correlation Clustering problem asks to partition $V$ into clusters to minimize the number of $+$edges between different clusters plus the number of $-$edges…
We extend the concept of polynomial time approximation algorithms to apply to problems for hierarchically specified graphs, many of which are PSPACE-complete. Assuming P != PSPACE, the existence or nonexistence of such efficient…
We study the precedence-constrained resource scheduling problem [SICOMP'75]. There are $n$ jobs where each job takes a certain time to finish and has a resource requirement throughout the execution time. There are precedence among the jobs.…
In 1976, Coffman and Sethi conjectured that a natural extension of LPT list scheduling to the bicriteria scheduling problem of minimizing makespan over flowtime optimal schedules, called LD algorithm, has a simple worst-case performance…
Positive linear programs (LP), also known as packing and covering linear programs, are an important class of problems that bridges computer science, operations research, and optimization. Despite the consistent efforts on this problem, all…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…
The classical work of (Arora et al., 1999) provides a scheme that gives, for any $\epsilon>0$, a polynomial time $1-\epsilon$ approximation algorithm for dense instances of a family of $\mathcal{NP}$-hard problems, such as Max-CUT and…
Time-dependent scheduling with linear deterioration involves determining when to execute jobs whose processing times degrade as their beginning is delayed. Each job i is associated with a release time r_i and a processing time function…
We study approximation algorithms for the following geometric version of the maximum coverage problem: Let $\mathcal{P}$ be a set of $n$ weighted points in the plane. Let $D$ represent a planar object, such as a rectangle, or a disk. We…
We consider the Vector Scheduling problem on identical machines: we have m machines, and a set J of n jobs, where each job j has a processing-time vector $p_j\in \mathbb{R}^d_{\geq 0}$. The goal is to find an assignment $\sigma:J\to [m]$ of…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
Mixed packing and covering problems are problems that can be formulated as linear programs using only non-negative coefficients. Examples include multicommodity network flow, the Held-Karp lower bound on TSP, fractional relaxations of set…
The Map-Reduce computing framework rose to prominence with datasets of such size that dozens of machines on a single cluster were needed for individual jobs. As datasets approach the exabyte scale, a single job may need distributed…
Coffman and Sethi proposed a heuristic algorithm, called LD, for multi-processor scheduling, to minimize makespan over flowtime-optimal schedules. LD algorithm is a natural extension of a very well-known list scheduling algorithm, Longest…
We study classical deadline-based preemptive scheduling of tasks in a computing environment equipped with both dynamic speed scaling and sleep state capabilities: Each task is specified by a release time, a deadline and a processing volume,…