Related papers: Interval scheduling maximizing minimum coverage
The Operational Fixed Interval Scheduling Problem aims to find an assignment of jobs to machines that maximizes the total weight of the completed jobs. We introduce a new variant of the problem where we consider the additional goal of…
We introduce the following elementary scheduling problem. We are given a collection of n jobs, where each job has an integer length as well as a set Ti of time intervals in which it can be feasibly scheduled. Given a parameter B, the…
We study the wireless scheduling problem in the SINR model. More specifically, given a set of $n$ links, each a sender-receiver pair, we wish to partition (or \emph{schedule}) the links into the minimum number of slots, each satisfying…
We study the precedence-constrained resource scheduling problem [SICOMP'75]. There are $n$ jobs where each job takes a certain time to finish and has a resource requirement throughout the execution time. There are precedence among the jobs.…
We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…
In this paper we study the classical problem of throughput maximization. In this problem we have a collection $J$ of $n$ jobs, each having a release time $r_j$, deadline $d_j$, and processing time $p_j$. They have to be scheduled…
Coflow is a prominent network abstraction for modeling communication patterns in data centers. Since coflow scheduling in large-scale data centers is $\mathcal{NP}$-hard, this paper investigates this problem within heterogeneous parallel…
We consider the problem of scheduling multiprocessor jobs to minimize the total completion time under the given energy budget. Each multiprocessor job requires more than one processor at the same moment of time. Processors may operate at…
The maximum coverage problem is to select $k$ sets from a collection of sets such that the cardinality of the union of the selected sets is maximized. We consider $(1-1/e-\epsilon)$-approximation algorithms for this NP-hard problem in three…
In the Proper Interval Completion problem we are given a graph G and an integer k, and the task is to turn G using at most k edge additions into a proper interval graph, i.e., a graph admitting an intersection model of equal-length…
In this paper, we study the active time scheduling problem. We are given n jobs with integral processing times each of which has an integral release time and deadline. The goal is to schedule all the jobs on a machine that can work on b…
In the paper we consider the problem of scheduling $n$ identical jobs on 3 uniform machines with speeds $s_1, s_2,$ and $s_3$ to minimize the schedule length. We assume that jobs are subjected to some kind of mutual exclusion constraints,…
We consider offline scheduling algorithms that incorporate speed scaling to address the bicriteria problem of minimizing energy consumption and a scheduling metric. For makespan, we give linear-time algorithms to compute all non-dominated…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
We consider an off-line optimisation problem where $k$ robots must service $n$ requests on a single line. A request $i$ has weight $w_i$ and takes place at time $t_i$ at location $d_i$ on the line. A robot can service a request and collect…
In moldable job scheduling, we are provided $m$ identical machines and $n$ jobs that can be executed on a variable number of machines. The execution time of each job depends on the number of machines assigned to execute that job. For the…
A prominent problem in scheduling theory is the weighted flow time problem on one machine. We are given a machine and a set of jobs, each of them characterized by a processing time, a release time, and a weight. The goal is to find a…
We study a geometric facility location problem under imprecision. Given $n$ unit intervals in the real line, each with one of $k$ colors, the goal is to place one point in each interval such that the resulting \emph{minimum color-spanning…
This paper studies the bicriteria problem of scheduling $n$ jobs on a serial-batch machine to minimize makespan and maximum cost simultaneously. A serial-batch machine can process up to $b$ jobs as a batch, where $b$ is known as the batch…
For a given set of intervals on the real line, we consider the problem of ordering the intervals with the goal of minimizing an objective function that depends on the exposed interval pieces (that is, the pieces that are not covered by…