Related papers: Tight Lower Bounds for the Workflow Satisfiability…
The paper deals with the Feedback Vertex Set problem parameterized by the solution size. Given a graph $G$ and a parameter $k$, one has to decide if there is a set $S$ of at most $k$ vertices such that $G-S$ is acyclic. Assuming the…
In a recent paper, Braun, Chung and Graham [1] have addressed a single-processor scheduling problem with time restrictions. Given a fixed integer $B \geq 2$, there is a set of jobs to be processed by a single processor subject to the…
In the Asymmetric Traveling Salesperson Problem (ATSP) the goal is to find a closed walk of minimum cost in a directed graph visiting every vertex. We consider the approximability of ATSP on topologically restricted graphs. It has been…
Many real-world problems can be formulated as a constrained Traveling Salesman Problem (TSP). However, the constraints are always complex and numerous, making the TSPs challenging to solve. When the number of complicated constraints grows,…
This paper focuses on the problem of coflow scheduling with precedence constraints in identical parallel networks, which is a well-known $\mathcal{NP}$-hard problem. Coflow is a relatively new network abstraction used to characterize…
Due to its optimality on a single machine for the problem of minimizing average flow time, Shortest-Remaining-Processing-Time (\srpt) appears to be the most natural algorithm to consider for the problem of minimizing average flow time on…
We present the first results on the parameterized complexity of reconfiguration problems, where a reconfiguration version of an optimization problem $Q$ takes as input two feasible solutions $S$ and $T$ and determines if there is a sequence…
Makespan minimization on unrelated machines is a classic problem in approximation algorithms. No polynomial time $(2-\delta)$-approximation algorithm is known for the problem for constant $\delta> 0$. This is true even for certain special…
We revisit a classical graph-theoretic problem, the \textit{single-source shortest-path} (SSSP) problem, in weighted unit-disk graphs. We first propose an exact (and deterministic) algorithm which solves the problem in $O(n \log^2 n)$ time…
We investigate parameterizing hard combinatorial problems by the size of the solution set compared to all solution candidates. Our main result is a uniform sampling algorithm for satisfying assignments of 2-CNF formulas that runs in…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
The exact matching problem is a constrained variant of the maximum matching problem: given a graph with each edge having a weight $0$ or $1$ and an integer $k$, the goal is to find a perfect matching of weight exactly $k$. Mulmuley,…
The lower and the upper irredundance numbers of a graph $G$, denoted $ir(G)$ and $IR(G)$ respectively, are conceptually linked to domination and independence numbers and have numerous relations to other graph parameters. It is a…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
Motivated by the success of bounded model checking framework for finite state machines, Ouaknine and Worrell proposed a time-bounded theory of real-time verification by claiming that restriction to bounded-time recovers decidability for…
The Oven Scheduling Problem (OSP) is a new parallel batch scheduling problem that arises in the area of electronic component manufacturing. Jobs need to be scheduled to one of several ovens and may be processed simultaneously in one batch…
Bin Packing with $k$ bins is a fundamental optimisation problem in which we are given a set of $n$ integers and a capacity $T$ and the goal is to partition the set into $k$ subsets, each of total sum at most $T$. Bin Packing is NP-hard…
In this paper we consider single machine scheduling problems with additional non-renewable resource constraints. Examples for non-renewable resources include raw materials, energy, or money. Usually they have an initial stock and…
We give new sublinear and parallel algorithms for the extensively studied problem of approximating n-variable r-CSPs (constraint satisfaction problems with constraints of arity r up to an additive error. The running time of our algorithms…
This paper depicts algorithms for solving the decision Boolean Satisfiability Problem. An extreme problem is formulated to analyze the complexity of algorithms and the complexity for solving it. A novel and easy reformulation as a lottery…