Related papers: Approximation Ratio of LD Algorithm for Multi-Proc…
Motivated by mail delivery scheduling problems arising in Royal Mail, we study a generalization of the fundamental makespan scheduling P||Cmax problem which we call the bounded job start scheduling problem. Given a set of jobs, each…
This paper studies a scheduling problem in a parallel machine setting, where each machine must adhere to a predetermined fixed order for processing the jobs. Given $n$ jobs, each with processing times and deadlines, we aim to minimize the…
In a classical problem in scheduling, one has $n$ unit size jobs with a precedence order and the goal is to find a schedule of those jobs on $m$ identical machines as to minimize the makespan. It is one of the remaining four open problems…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…
This research addresses the multiprocessor scheduling problem of hard real-time systems, and it especially focuses on optimal and global schedulers when practical constraints are taken into account. First, we propose an improvement of the…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…
We consider a distributed computing network consisting of a master and multiple workers processing tasks of different types. The master is running multiple applications. Each application stochastically generates real-time jobs with a strict…
One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelated machines, i.e., job j requires time p_{ij} if processed on…
We investigate the scheduling of $n$ jobs divided into $c$ classes on $m$ identical parallel machines. For every class there is a setup time which is required whenever a machine switches from the processing of one class to another class.…
We study the classical scheduling problem on parallel machines %with precedence constraints where the precedence graph has the bounded depth $h$. Our goal is to minimize the maximum completion time. We focus on developing approximation…
We are concerned with the problem of scheduling $n$ jobs onto $m$ identical machines. Each machine has to be in operation for a prescribed time, and the objective is to minimize the total machine working time. Precisely, let $c_i$ be the…
We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the…
We revisit two well-studied scheduling problems in the unrelated machines setting where each job can have a different processing time on each machine. For minimizing total weighted completion time we give a 1.45-approximation, which…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
We consider the classical scheduling problem on parallel identical machines to minimize the makespan, and achieve the following results under the Exponential Time Hypothesis (ETH) 1. The scheduling problem on a constant number $m$ of…
The starting point of this paper is the problem of scheduling $n$ jobs with processing times and due dates on a single machine so as to minimize the total processing time of tardy jobs, i.e., $1||\sum p_j U_j$. This problem was identified…
A central problem in scheduling is to schedule $n$ unit size jobs with precedence constraints on $m$ identical machines so as to minimize the makespan. For $m=3$, it is not even known if the problem is NP-hard and this is one of the last…
In 2005 Li et al. gave a phi-competitive deterministic online algorithm for scheduling of packets with agreeable deadlines with a very interesting analysis. This is known to be optimal due to a lower bound by Hajek. We claim that the…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…