English
Related papers

Related papers: A New Beam Injection Scheme for the Fermilab Boost…

200 papers

The Fermilab Booster uses multi-turn beam injection with all its cavities phased such that beam sees a net zero RF voltage even when each station is at the same maxi-mum voltage. During beam capture the RF voltage is increased slowly by…

Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector…

Accelerator Physics · Physics 2015-10-29 C. M. Bhat

Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the…

Accelerator Physics · Physics 2017-04-27 C. M. Bhat

Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its…

Accelerator Physics · Physics 2017-05-04 C. M. Bhat

The Fermilab Booster is being upgraded under the Proton Improvement Plan (PIP) to be capable of providing a proton flux of $2.25^{17}$ protons per hour. The intensity per cycle will remain at the present operational $4.3^{12}$ protons per…

Accelerator Physics · Physics 2015-11-05 K. Seiya , C. M. Bhat , D. E. Johnson , V. V. Kapin , W. A. Pellico , C. Y. Tan , R. J. Tesarek

The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main…

Accelerator Physics · Physics 2015-02-03 K. Seiya , S. Chaurize , C. Drennan , W. Pellico , A. K. Triplett , A. Waller

Two barrier RF systems were fabricated, tested and installed in the Fermilab Main Injector. Each can provide 8 kV rectangular pulses (the RF barriers) at 90 kHz. When a stationary barrier is combined with a moving barrier, injected beams…

Accelerator Physics · Physics 2010-01-18 W. Chou , D. Capista , J. Griffin , K-Y. Ng , D. Wildman

The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…

Accelerator Physics · Physics 2013-01-31 K. Seiya , J. Lackey , W. Marsh , W. Pellico , D. Still , K. Triplet , A. Waller

The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…

Accelerator Physics · Physics 2013-01-31 K. Seiya , C. Drennan , W. A. Pellico , K. Triplett , A. Waller

Increasing proton beam power on neutrino production targets is one of the major goals of the Fermilab long term accelerator programs. In this effort, the Fermilab 8 GeV Booster synchrotron plays a critical role for at least the next two…

Accelerator Physics · Physics 2017-10-23 C. M. Bhat , S. Bhat

At the Fermilab Booster, and many other proton facili-ties, an intense proton beam is accumulated by multi-turn injection of an H- beam through a stripping foil. The circu-lating beam scatters off the injection foil and large-angle Coulomb…

Accelerator Physics · Physics 2019-12-09 J. Eldred , C. M. Bhat , S. Chaurize , V. Lebedev , S. Nagaitsev , K. Seiya , C. Y. Tan , R. J. Tesarek

This paper introduces a new method for stacking beams in the longitudinal phase space. It uses RF barriers to confine and compress beams in an accelerator, provided that the machine momentum acceptance is a few times larger than the…

Accelerator Physics · Physics 2007-05-23 Weiren Chou , Akira Takagi

The difference between the rf voltage seen by the beam and the accelerating voltage required to match the rate of change of the Booster magnetic field is used to estimate the energy loss per beam turn. Because the rf voltage (RFSUM) and the…

Accelerator Physics · Physics 2007-05-23 Xi Yang , C. Ankenbrandt , J. Norem

Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This…

The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…

Accelerator Physics · Physics 2024-06-03 J. -F. Ostiguy , C. M. Bhat

In order to meet the needs of Fermilabs planned post-collider experimental program, the total proton throughput of the 8 GeV Booster accelerator must be nearly doubled within the next two years. A system of 48 ramped corrector magnets has…

Accelerator Physics · Physics 2012-03-09 M. McAteer , S. Kopp , E. Prebys

A feed-forward ramp can be implemented in Booster to compensate the beam energy loss at different beam intensities for the purpose of minimizing the radial error signal. This can be done only when we have a good understanding about the…

Accelerator Physics · Physics 2007-05-23 Xi Yang , Rene Padilla

A technique using RF bucket reduction for acquiring information about the particle distribution in longitudinal phase space has been applied in the Fermilab Booster. Data sets were obtained at six important time intervals of a Booster cycle…

Accelerator Physics · Physics 2007-05-23 Xi Yang , C. Ankenbrandt

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In…

Accelerator Physics · Physics 2023-08-15 D. Neuffer , S. Belomestnykh , M. Checchin , D. Johnson , S. Posen , E. Pozdeyev , V. Pronskikh , A. Saini , N. Solyak , V. Yakovlev

The extraction bucket position in the Fermilab Booster is controlled with a cogging process that involves the comparison of the Booster RF count and the Recycler Ring revolution marker. A one RF bucket jitter in the extraction bucket…

Accelerator Physics · Physics 2017-09-22 K. Seiya , C. Drennan , W. Pellico , S. Chaurize
‹ Prev 1 2 3 10 Next ›