In this paper, we consider the problem of scheduling jobs on parallel identical machines, where the processing times of jobs are uncertain: only interval bounds of processing times are known. The optimality criterion of a schedule is the…
This paper examines scheduling problem denoted as $P|seq, ser|C_{max}$ in Graham's notation; in other words, scheduling of tasks on parallel identical machines ($P$) with sequence-dependent setups ($seq$) each performed by one of the…
This paper presents improved approximation algorithms for the problem of multiprocessor scheduling under uncertainty, or SUU, in which the execution of each job may fail probabilistically. This problem is motivated by the increasing use of…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
We connect the study of pseudodeterministic algorithms to two major open problems about the structural complexity of $\mathsf{BPTIME}$: proving hierarchy theorems and showing the existence of complete problems. Our main contributions can be…
Classical list scheduling is a very popular and efficient technique for scheduling jobs in parallel and distributed platforms. It is inherently centralized. However, with the increasing number of processors, the cost for managing a single…
This paper introduces a parallel scheduling problem where a directed acyclic graph modeling $t$ tasks and their dependencies needs to be executed on $n$ unreliable workers. Worker $i$ executes task $j$ correctly with probability $p_{i,j}$.…
Efficient and robust task planning for a human-robot collaboration (HRC) system remains challenging. The human-aware task planner needs to assign jobs to both robots and human workers so that they can work collaboratively to achieve better…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
A moldable job is a job that can be executed on an arbitrary number of processors, and whose processing time depends on the number of processors allotted to it. A moldable job is monotone if its work doesn't decrease for an increasing…
When a computer system schedules jobs there is typically a significant cost associated with preempting a job during execution. This cost can be from the expensive task of saving the memory's state and loading data into and out of memory. It…
Machine scheduling problems involving conflict jobs can be seen as a constrained version of the classical scheduling problem, in which some jobs are conflict in the sense that they cannot be proceeded simultaneously on different machines.…
The A* algorithm is commonly used to solve NP-hard combinatorial optimization problems. When provided with a completely informed heuristic function, A* solves many NP-hard minimum-cost path problems in time polynomial in the branching…
We initiate a systematic study of utilizing predictions to improve over approximation guarantees of classic algorithms, without increasing the running time. We propose a systematic method for a wide class of optimization problems that ask…
When using sampling-based motion planners, such as PRMs, in configuration spaces, it is difficult to determine how many samples are required for the PRM to find a solution consistently. This is relevant in Task and Motion Planning (TAMP),…
When analyzing real-world data it is common to work with event ensembles, which comprise sets of observations that collectively constrain the parameters of an underlying model of interest. Such models often have a hierarchical structure,…
An acceptable response time of a server is an important aspect in many client-server applications; this is evident in situations in which the server is overloaded by many computationally intensive requests. In this work, we consider that…
We study the problem of scheduling $n$ independent moldable tasks on $m$ processors that arises in large-scale parallel computations. When tasks are monotonic, the best known result is a $(\frac{3}{2}+\epsilon)$-approximation algorithm for…
Modern platforms are using accelerators in conjunction with standard processing units in order to reduce the running time of specific operations, such as matrix operations, and improve their performance. Scheduling on such hybrid platforms…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…