In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…

Optimization and Control · Mathematics 2014-12-17 Anna Romanova

We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job…

Data Structures and Algorithms · Computer Science 2012-12-11 Frans Schalekamp , Rene Sitters , Suzanne van der Ster , Leen Stougie , Victor Verdugo , Anke van Zuylen

We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…

Discrete Mathematics · Computer Science 2018-11-19 T. Janssen , C. Swennenhuis , A. Bitar , T. Bosman , D. Gijswijt , L. van Iersel , S. Dauzére-Pérès , C. Yugma

We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…

Data Structures and Algorithms · Computer Science 2015-10-30 Kameng Nip , Zhenbo Wang , Zizhuo Wang

The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…

Optimization and Control · Mathematics 2023-06-16 Nodari Vakhania , Frank Werner , Alejandro Reynoso

We study the problem of non-preemptively scheduling $n$ jobs, each job $j$ with a release time $t_j$, a deadline $d_j$, and a processing time $p_j$, on $m$ parallel identical machines. Cieliebak et al. (2004) considered the two constraints…

Data Structures and Algorithms · Computer Science 2017-05-25 René van Bevern , Rolf Niedermeier , Ondřej Suchý

The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…

Data Structures and Algorithms · Computer Science 2021-06-15 Yakov Zinder , Joanna Berlińska , Charlie Peter

Personnel scheduling problems have received considerable academic attention due to their relevance in various real-world applications. These problems involve preparing feasible schedules for an organization's employees and often account for…

Data Structures and Algorithms · Computer Science 2025-09-03 Fabien Nießen , Paul Paschmanns

This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…

Data Structures and Algorithms · Computer Science 2013-11-13 Abhishek Awasthi , Jörg Lässig , Oliver Kramer

This paper considers parallel machine scheduling with incompatibilities between jobs. The jobs form a graph and no two jobs connected by an edge are allowed to be assigned to the same machine. In particular, we study the case where the…

Computational Complexity · Computer Science 2021-03-16 Klaus Jansen , Alexandra Lassota , Marten Maack , Tytus Pikies

This paper resolves a long-standing open question in bicriteria scheduling regarding the complexity of a single machine scheduling problem which combines the number of tardy jobs and the maximal tardiness criteria. We use the lexicographic…

Data Structures and Algorithms · Computer Science 2025-02-17 Klaus Heeger , Danny Hermelin , Michael L. Pinedo , Dvir Shabtay

We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…

Data Structures and Algorithms · Computer Science 2020-07-21 Marek Chrobak , Mordecai Golin , Tak-Wah Lam , Dorian Nogneng

We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…

Data Structures and Algorithms · Computer Science 2020-04-27 Peter Gyorgyi , Tamas Kis

We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…

Data Structures and Algorithms · Computer Science 2015-07-06 Hossein Efsandiari , MohammadTaghi Hajiaghyi , Jochen Koenemann , Hamid Mahini , David Malec , Laura Sanita

In this paper, we study the active time scheduling problem. We are given n jobs with integral processing times each of which has an integral release time and deadline. The goal is to schedule all the jobs on a machine that can work on b…

Computational Complexity · Computer Science 2021-12-07 Sagnik Saha , Manish Purohit

In the paper we consider the problem of scheduling $n$ identical jobs on 4 uniform machines with speeds $s_1 \geq s_2 \geq s_3 \geq s_4,$ respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are…

Data Structures and Algorithms · Computer Science 2016-02-08 H. Furmanczyk , M. Kubale

We study the problem of preemptive scheduling n jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. We show that when all jobs have equal processing times then the problem can…

Data Structures and Algorithms · Computer Science 2007-05-23 Philippe Baptiste , Peter Brucker , Marek Chrobak , Christoph Durr , Svetlana A. Kravchenko , Francis Sourd

We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the…

Data Structures and Algorithms · Computer Science 2022-05-06 Nodari Vakhania

This paper studies scheduling coupled tasks with exact delays to minimize maximum lateness. The first task has processing time $p>0$ and the second $b_i\geq 0$, also the second needs to start exactly $p$ units of time after the completion…

Discrete Mathematics · Computer Science 2026-02-24 Wiesław Kubiak

This paper studies a scheduling problem in a parallel machine setting, where each machine must adhere to a predetermined fixed order for processing the jobs. Given $n$ jobs, each with processing times and deadlines, we aim to minimize the…

Data Structures and Algorithms · Computer Science 2025-05-16 Andre Berger , Arman Rouhani , Marc Schröder