Related papers: On $(1,\epsilon)$-Restricted Assignment Makespan M…
We show that one can approximate the least fixed point solution for a multivariate system of monotone probabilistic max(min) polynomial equations, referred to as maxPPSs (and minPPSs, respectively), in time polynomial in both the encoding…
We give an algorithm to compute a one-dimensional shape-constrained function that best fits given data in weighted-$L_{\infty}$ norm. We give a single algorithm that works for a variety of commonly studied shape constraints including…
We consider single-machine scheduling problems that are natural generalizations or variations of the min-sum set cover problem and the min-sum vertex cover problem. For each of these problems, we give new approximation algorithms. Some of…
The problem of maximizing the $p$-th power of a $p$-norm over a halfspace-presented polytope in $\R^d$ is a convex maximization problem which plays a fundamental role in computational convexity. It has been shown in 1986 that this problem…
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing…
In this paper, we study the tradeoff between the approximation guarantee and adaptivity for the problem of maximizing a monotone submodular function subject to a cardinality constraint. The adaptivity of an algorithm is the number of…
In this work we give a tight lower bound on makespan approximations for envy-free allocation mechanism dedicated to scheduling tasks on unrelated machines. Specifically, we show that no mechanism exists that can guarantee an envy-free…
We consider the SUBSET SUM problem and its important variants in this paper. In the SUBSET SUM problem, a (multi-)set $X$ of $n$ positive numbers and a target number $t$ are given, and the task is to find a subset of $X$ with the maximal…
The minimum unsatisfiability version of a constraint satisfaction problem (MinCSP) asks for an assignment where the number of unsatisfied constraints is minimum possible, or equivalently, asks for a minimum-size set of constraints whose…
Packing problems are an important class of optimization problems. The probably most well-known problem if this type is knapsack and many generalizations of it have been studied in the literature like Two-dimensional Geometric Knapsack…
We consider non-preemptive scheduling of MapReduce jobs with multiple tasks in the practical scenario where each job requires several map-reduce rounds. We seek to minimize the average weighted completion time and consider scheduling on…
In the bottleneck multiple knapsack problem, we are given a set of items and a set of knapsacks, where each item has a profit and a weight, and each knapsack has a capacity. Our goal is to assign items to knapsacks so as to maximize the…
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…
We study the Parallel Task Scheduling problem $Pm|size_j|C_{\max}$ with a constant number of machines. This problem is known to be strongly NP-complete for each $m \geq 5$, while it is solvable in pseudo-polynomial time for each $m \leq 3$.…
This thesis investigates the extent to which the optimal value of a constraint satisfaction problem (CSP) can be approximated by some sentence of fixed point logic with counting (FPC). It is known that, assuming $\mathsf{P} \neq…
$k$-Coloring Reconfiguration is one of the most well-studied reconfiguration problems, which asks to transform a given proper $k$-coloring of a graph to another by repeatedly recoloring a single vertex. Its approximate version, Maxmin…
In this paper we study the relation of two fundamental problems in scheduling and fair allocation: makespan minimization on unrelated parallel machines and max-min fair allocation, also known as the Santa Claus problem. For both of these…
We consider the classic scheduling problem of minimizing the total weighted flow-time on a single machine (min-WPFT), when preemption is allowed. In this problem, we are given a set of $n$ jobs, each job having a release time $r_j$, a…
We revisit the unrelated machine scheduling problem with the weighted completion time objective. It is known that independent rounding achieves a 1.5 approximation for the problem, and many prior algorithms improve upon this ratio by…
$ $In many optimization problems, a feasible solution induces a multi-dimensional cost vector. For example, in load-balancing a schedule induces a load vector across the machines. In $k$-clustering, opening $k$ facilities induces an…