In this paper we study a simple extension of the total weighted flowtime minimization problem for single and identical parallel machines. While the standard problem simply defines a set of jobs with their processing times and weights and…
The $1|B,r_j|\sum w_jU_j$ scheduling problem takes as input a batch setup time $\Delta$ and a set of $n$ jobs, each having a processing time, a release date, a weight, and a due date; the task is to find a sequence of batches that minimizes…
We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the…
An important objective in scheduling literature is to minimize the sum of weighted flow times. We are given a set of jobs where each job is characterized by a release time, a processing time, and a weight. Our goal is to find a preemptive…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
This paper studies the scheduling of jobs of different families on parallel machines with qualification constraints. Originating from semiconductor manufacturing, this constraint imposes a time threshold between the execution of two jobs of…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
The pairwise reachability problem for a multi-threaded program asks, given control locations in two threads, whether they can be simultaneously reached in an execution of the program. The problem is important for static analysis and is used…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
While almost all existing works which optimally solve just-in-time scheduling problems propose dedicated algorithmic approaches, we propose in this work mixed integer formulations. We consider a single machine scheduling problem that aims…
The NP-hard MATERIAL CONSUMPTION SCHEDULING Problem and closely related problems have been thoroughly studied since the 1980's. Roughly speaking, the problem deals with minimizing the makespan when scheduling jobs that consume non-renewable…
We consider the classical scheduling problem on a single machine, on which we need to schedule sequentially $n$ given jobs. Every job $j$ has a processing time $p_j$ and a priority weight $w_j$, and for a given schedule a completion time…
We address the tactical fixed job scheduling problem with spread-time constraints. In such a problem, there are a fixed number of classes of machines and a fixed number of groups of jobs. Jobs of the same group can only be processed by…
In scheduling and timetabling applications, the mutual-exclusion constraint stipulates that certain pairs of tasks that cannot be executed at the same time. This corresponds to the vertex colouring problem in graph theory, for which there…
The Operational Fixed Interval Scheduling Problem aims to find an assignment of jobs to machines that maximizes the total weight of the completed jobs. We introduce a new variant of the problem where we consider the additional goal of…
We study the general scheduling problem (GSP) which generalizes and unifies several well-studied preemptive single-machine scheduling problems, such as weighted flow time, weighted sum of completion time, and minimizing the total weight of…
The workflow satisfiability problem (WSP) asks whether there exists an assignment of authorized users to the steps in a workflow specification that satisfies the constraints in the specification. The problem is NP-hard in general, but…
We consider the classical scheduling problem on parallel identical machines to minimize the makespan, and achieve the following results under the Exponential Time Hypothesis (ETH) 1. The scheduling problem on a constant number $m$ of…
Gibbons and Korach studied a fundamental problem in 1997: given an observed sequence of reads and writes of a multi-threaded program, does there exist an interleaving which is sequentially consistent? Apart from applications in testing…
Combinatorial optimization problems are considered to be an application, where quantum computing can have transformative impact. In the industrial context, job shop scheduling problems that aim at finding the optimal schedule for a set of…