Related papers: Progress Toward Doubling the Beam Power at Fermila…
This review paper describes the energy-upgraded CEBAF accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing eighty-eight superconducting cavities that have operated…
We describe the physics capabilites and status of the MIPP experiment which is scheduled to enter its physics data taking period during December 2004-July 2005. We show some of the results obtained from the engineering run that concluded in…
For Project X, the Fermilab Main Injector will be required to operate with 3 times higher bunch intensity. The plan to study the space charge effects at the injection energy with intense bunches will be discussed.
The next generation of high-energy physics experiments requires high intensity protons in the multi-GeV energy range for efficient production of secondary beams. The Fermilab long-term future requires an 8 GeV proton source to feed the Main…
Over the course of the past years the experimental measurements performed by the two large collaborations, CDF and D{\O}, at the Fermilab Tevatron Collider have fueled advances in our understanding of physics at the energy frontier. At the…
Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential…
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into…
Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton…
At the end of its operations in 2011, the Fermilab antiproton production complex consisted of a sophisticated target system, three 8-GeV storage rings (namely the Debuncher, the Accumulator and the Recycler), 25 independent multi-GHz…
The D0 Detector at Fermilab is currently undergoing an extensive upgrade to participate in the Run II data taking which shall begin on March 1, 2001. The design of the detector meets the requirements of the high luminosity environment…
For the PIP-II program, transverse emittance in the Fermilab Booster must remain well controlled at higher bunch intensities. 4-plate beam position monitors (BPMs) have a small but measurable quadrupole moment, making it possible to infer…
The Fermilab Tevatron will be the world's highest energy hadron collider until the LHC is commissioned, it has the world's highest energy fixed target beams, and Fermilab will be the leading high energy physics laboratory in the US for the…
The Integrable Optics Test Accelerator (IOTA) is a storage ring for advanced beam physics research currently being built and commissioned at Fermilab. It will operate with protons and electrons using injectors with momenta of 70 and 150…
For Project X Fermilab Main Injector will be required to provide up to 2.3 MW to a neutrino production target at energies between 60 and 120 GeV. To accomplish the above power levels 3 times the current beam intensity will need to be…
I will present the status of the long baseline neutrino oscillation experiment MINOS at Fermi National Accelerator Laboratory (Fermilab). I will summarize the status of the detector and beam construction, the expected event rates and…
The intensity of charged particle beams at Fermilab must be kept within pre-determined safety and operational envelopes in part by assuring all beam within a few percent has been transported from any source to destination. Beam intensity…
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such…
The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility, is a beamline capable of delivering 20-mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator…
PIP-II is an 800 MeV superconducting RF linear accelerator under development at Fermilab. As the new first stage in our accelerator chain, it will deliver high-power beam to multiple experiments simultaneously and thus drive Fermilab's…
We present the current and planned beam physics research program and accelerator education program at Advanced Superconducting Test Accelerator (ASTA) at Fermilab.