Related papers: R&D for a Dedicated Fast Timing Layer in the CMS E…
High-Luminosity running at the LHC, which is planned for 2022 and beyond, will imply an order of magnitude increase in radiation levels and particle fluences with respect to the present LHC running conditions. The performance evolution of…
The Compact Muon Solenoid (CMS) detector at the CERN Large Hadron Collider (LHC) is undergoing an extensive Phase II upgrade program to prepare for the challenging conditions of the High-Luminosity LHC (HL-LHC). A new timing layer is…
The CMS pixel detector has been designed for a peak luminosity of 10^34cm-2s-1 and a total dose corresponding to 2 years of LHC operation at a radius of 4 cm from the interaction region. Parts of the pixel detector will have to be replaced…
It is expected that the LHC accelerator and experiments will undergo a luminosity upgrade which will commence after several years of running. This part of the LHC operations is referred to as Super-LHC (SLHC) and is expected to provide…
After the Large Hadron Collider (LHC) upgrade into High Luminosity LHC (HL-LHC), the instantaneous luminosity is expected to reach values up to 7.5x10^34cm^2/s, causing a harsher radiation environment as well as a significant increase in…
This paper discusses the design and performance of the time measurement technique and of the synchronization systems of the CMS hadron calorimeter. Time measurement performance results are presented from test beam data taken in the years…
At the start of Run 2 in 2015, the LHC delivered proton-proton collisions at a center-of-mass energy of 13 TeV. During Run 2 (years 2015-2018) the LHC eventually reached a luminosity of 2.1 $\times$ 10$^{34}$ cm$^{-2}$ s$^{-1}$, almost…
In January 2007 the CERN director general announced the plan for the staged upgrade of the LHC luminosity. The plan foresees a phase 1 upgrade reaching a peak luminosity of $3 \times 10^{34}$ cm$^{-2}$s$^{-1}$ followed by phase reaching up…
Plans to upgrade the LHC after approximately 10 years of operation are currently being considered at CERN. A tenfold increase in luminosity delivered to the experiments is envisaged in the so-called Super LHC (SLHC). This will undoubtedly…
Radiation damage significantly impacts the performance of silicon tracking detectors in Large Hadron Collider (LHC) experiments such as ATLAS and CMS, with signal reduction being the most critical effect; adjusting sensor bias voltage and…
The Timepix particle tracking telescope has been developed as part of the LHCb VELO Upgrade project, supported by the Medipix Collaboration and the AIDA framework. It is a primary piece of infrastructure for the VELO Upgrade project and is…
During the High Luminosity programme of the LHC collider (called HL-LHC), planned to start in 2030, the instantaneous luminosity will be increased from \num{\sim 2e34}~\si{cm^{-2}s^{-1}} to an unprecedented figure of about \num{\sim…
One of the major limitations of microlensing observations toward the Large Magellanic Cloud (LMC) is the low rate of event detection. What can be done to improve this rate? Is it better to invest telescope time in more frequent observations…
A new pixel detector for the CMS experiment was built in order to cope with the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking with a reduced material budget…
The prospect of pileup induced backgrounds at the High Luminosity LHC (HL-LHC) has stimulated intense interest in technology for charged particle timing at high rates\cite{challenge}. In this paper I report on a framework for fast timing…
Hundreds of concurrent collisions per bunch crossing are expected at future hadron colliders. Precision timing calorimetry has been advocated as a way to mitigate the pileup effects and, thanks to their excellent time resolution,…
First of its kind, the barrel section of the MIP Timing Detector is a large area timing detector based on LYSO:Ce crystals and SiPMs which are required to operate in an unprecedentedly harsh radiation environment (up to an integrated…
To cope with the challenging environment of the planned high luminosity upgrade of the Large Hadron Collider (HL-LHC), scheduled to start operation in 2029, CMS will replace its entire tracking system. The requirements for the tracker are…
A template fitting technique for reconstructing the amplitude of signals produced by the lead tungstate crystals of the CMS electromagnetic calorimeter is described. This novel approach is designed to suppress the increased out-of-time…
During the high-luminosity phase of the LHC (HL-LHC), planned to start around 2027, the accelerator is expected to deliver an instantaneous peak luminosity of up to $7.5\times10^{34}$ cm$^{-2}$s$^{-1}$. A total integrated luminosity of…